My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06/17/2025
CBCC
>
Meetings
>
2020's
>
2025
>
06/17/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/18/2025 10:06:43 AM
Creation date
7/18/2025 9:38:17 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
06/17/2025
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
296
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Agencies/Owners (UAOs) <br />• Identify conflicts and develop conflict matrix <br />• Develop utility work schedules and/or get commitment for relocation/adjustment from <br />UAOs <br />8. Geotechnical <br />• (See Appendix A — Subconsultant Services) <br />V. SUBMITTAL/DELIVERABLES <br />The following deliverables are associated with this project: <br />1. One set of biddable contract plans <br />2. Electronic/CADD files with backup calculations and quantities <br />3. One engineering cost estimate based on final quantities <br />4. Specifications package <br />VI. REPORTING <br />The consultant shall coordinate any necessary items with the COUNTY'S Engineer. <br />VII. SCHEDULE/LENGTH OF SERVICE <br />The following is an approximate schedule of deliverables upon NTP: <br />• Drainage Alternatives Design/Documentation Report (4 weeks) <br />o Investigate requirements for conveyance and attenuation, and provide drainage design <br />alternatives <br />o Present to County and determine final design concept <br />• 60% Plans Submittal (6 weeks) <br />o Perform geotechnical field investigation and laboratory tests <br />o Perform initial utility coordination <br />o Perform initial permitting investigation <br />o Develop initial (60%) engineering deliverables <br />• Client comments/input (2 weeks) <br />• 100% Plans Submittal (4 weeks) <br />o Incorporate comments <br />o Finalize utility coordination <br />o Finalize permitting <br />o Develop final (100%) engineering deliverables <br />• Final comments (1 week) <br />• Address final comments, provide signed and sealed deliverables (1 week) <br />Page 6 of 7 <br />167 <br />
The URL can be used to link to this page
Your browser does not support the video tag.