My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06/17/2025
CBCC
>
Meetings
>
2020's
>
2025
>
06/17/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/18/2025 10:06:43 AM
Creation date
7/18/2025 9:38:17 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
06/17/2025
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
296
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Four large cut -away buses have met their 200,000/7 yr useful life and will be replaced with new large <br />cut -away Buses (30') (IRC Asset# // VIN // #255 // 4UZADRFD2JCKC4903, 254 // <br />4UZADRFD1JCKC4137, 253 H4UZADRFDOJCKC4135, 263 // 4UZADRFD4KCLT3970). Indian River <br />County will own the vehicles, yet the vehicles will be operated by the County's third -party transit <br />operator. All vehicles are ADA compliant. The new buses will have a useful life of 7 years or 200,000 <br />miles. The total anticipated federal cost for bus replacement is $1,100,000 or $275,000 per vehicle for <br />large cut -away bus. <br />Additionally, A 2015 Gillig 30' Heavy Duty Low Floor (Asset #241 // VIN 15GGE2712F1092928) with a <br />like for like vehicle in 2027. Asset # 241 has exceeded its useful life in FY 2025 with a total of 689,911 <br />miles. This mileage is almost 200% of the expected useful life being 10 years/ 350,000 miles. The <br />expected replacement cost is $570,000. The replacement vehicle will be purchased from the state <br />contract or the FPTA consortium contract, of which Indian River County is a listed party. Both contracts <br />will comply with FTA C 4220.1 F. <br />Will 3rd Party contractors be used to fulfill this activity line item? <br />Yes, 3rd Party Contractors will be used for this line item. <br />Propulsion Fuel Type Vehicle Condition Vehicle Size (ft.) <br />N/A N/A N/A <br />Funding Source Section of CFDA Amount <br />Statute Number <br />5307 - Urbanized Area Formula Grants (2013 and <br />forward) 5307-2A 20587 $1,535,000 <br />Local/In-Kind <br />.$0 <br />$383,750 <br />Total Eligible Cost $1,535,000 <br />Budget Activity Line Item: 11.93.02 - CONSTRUCTION - BUS SHELTERS <br />Scope Name / Code #Line Item Line Item Name Activity Quantity <br />199 <br />
The URL can be used to link to this page
Your browser does not support the video tag.