Laserfiche WebLink
RECEIVED <br />Exhibit "q �� MAY �. 5 2025 <br />Kirnley>>> Horn <br />HOBART PARK- Public Force Main <br />5/15/2025 <br />Engineer's Opinion of Probable Costs <br />Indian River County <br />SITE ITEMS QUANTITY UNIT UNIT COST COST <br />4" HDPE DIRECTIONAL BORE (1,460 LF) 1 LS $34,072.00 $34,072.00 <br />4" FORCE MAIN HDPE (1,460 LF) _ 1 LS $21,124.00 $21,124.00 <br />12" X 4" TAPPING SLEEVE & VALVE W/ FITTINGS 1 LS $5,760 $5,760 <br />TOTAL ESTIMATED IMPROVEMENT AMOUNT <br />TOTAL COST (Public Force Main): $60,956 <br />25% 1 -YEAR WARRANTY SECURITY = $15,239 <br />GREE <br />Z` No. 75R <br />EIII0NG <br />Sara R. Battles, P.E. <br />FL PE #75894 <br />The Engineer has no control over the cost of labor, materials, equipment, or over the Contractor's methods of determining prices or over competitive bidding or market conditions. Opinions of <br />probable costs provided herein are based on the information known to Engineer at this time and represent only the Engineer's judgment as a design professional familiar with the construction <br />ictta. The Engineer cannot and does not guarantee that proposals, bids, or actual construction costs will not vary from its opinions of probable costs. <br />gy0D <br />2 <br />' <br />cc <br />Mm;Qp 1.R. .J. <br />�-<�g> <br />} I �.5 Z0Z-s <br />epteAcc <br />V/V <br />? tnsufficie t <br />3 SSS <br />Page 1 of 1 <br />K:\VRB_LDEV\IRC CIP\Hobart\ENG\OPC\2025-05-15\2025-05-15 PUBLIC FM HOBART OPC <br />