My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2025-147
CBCC
>
Official Documents
>
2020's
>
2025
>
2025-147
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/28/2025 1:33:18 PM
Creation date
7/28/2025 1:32:26 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Change Order
Approved Date
07/15/2025
Control Number
2025-147
Agenda Item Number
9.D.
Entity Name
Haley Engineering Contractors, Inc.
Subject
Change Order No. 4 for Final Payment, Release of Retainage for Construction of 66th Ave Road
Widening (49th Street to 69th Street),
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
66TH AVENUE ROADWAY WIDENING (49TH STREET TO 69TH STREET) <br />PROJECT NO. IRC -1505 BID NO. 2021018 <br />Item No. " <br />Description _ _ .Unit <br />Quantl <br />'Unit Price <br />Priced ncrease <br />Price Decrease: <br />252 - 1 B Road <br />630-2-11A- CONDUIT OPEN TRENCH) (F&I) (2" <br />LF <br />18 <br />4.00 <br />72.00 <br />253 - 1 B Road <br />630-2-11B -CONDUIT OPEN TRENCH F 2" <br />LF <br />18 <br />4.00 <br />72.00 <br />264-IBS&M <br />711 -11 -121 -THERMOPLASTIC STD WHITE SOLID 6" <br />LF 1 <br />511 <br />1.00 <br />511.00 <br />265 - 16 S&M <br />711-11-122 -THERMOPLASTIC STD WHITE SOLID 8" <br />LF <br />515 <br />1.00 <br />515.00 <br />266 -1 B S&M <br />711-11-123 -THERMOPLASTIC STD WHITE SOLID 12" <br />LF <br />7 <br />2.50 <br />17.50 <br />267 -1 B S&M <br />711-11-124 - THERMOPLASTIC STD WHITE SOLID 18" <br />LF <br />4 <br />3.50 <br />14.00 <br />269 -1 B S&M <br />711-11-131 -THERMOPLASTIC, STD WHITE SKIP 10'-30' 6" <br />LF <br />9 <br />1.00 <br />9.00 <br />270 -1 B S&M <br />711-11-141 - THERMOPLASTIC STD WHITE SKIP 2'-4' / 6-10' 6" <br />LF <br />2 <br />1.00 <br />2.00 <br />274 - 1 B S&M <br />711-11-224 - THERMOPLASTIC STD YELLOW SOLID 18" <br />LF <br />10 <br />3.50 <br />35.00 <br />275 - 1 B S&M <br />711-11-241 - THERMOPLASTIC STD YELLOW SKIP (2'-4'/ 6'-101 <br />LF <br />1,109 <br />1.00 <br />1,109.00 <br />306 - 1 B LS & Irr <br />570-1-2B - PERFORMANCE TURF SOD ST AUGUSTINE'FLORAT <br />SY <br />16,355 <br />4.50 <br />73 597.50 <br />339 -1 B 65th B <br />455-34-3A - PRESTRESSED CONCRETE PILING 18" SQ <br />LF <br />208 <br />37.00 <br />7,696.00 <br />CO -3 635-2-12 <br />PULL & SPLICE BOX F & I SIGNAL 24 x 36 <br />EA <br />1 <br />2,630.25 <br />2,630.25 <br />WCDO03 <br />Overrun Underrun Pa Items 649 (Signal Mast Arms Phase 1 B Plan R <br />LS <br />1 <br />17 300.00 <br />17 300.00 <br />WCDO04 <br />ASPHALT PAVEMENT DESIGN TYPICAL SECTION PHASE 1A <br />LS <br />1 <br />29 920.00 <br />29 920.00 <br />WCD068 <br />REIMBRUSEMENT TO IRC FOR COST OF RESOLUTION TESTING <br />FOR 2 STABILIZING SUBGRADE SAMPLES WHERE VT RESULTS <br />WERE USED FOR ACCEPTANCE <br />LS <br />1 <br />243.20 <br />243.20 <br />WCD078 <br />REIMBURSEMENT TO IRC FOR COST OF 1,799 LF OF <br />PEDESTRIAN PIPE RAIL NOT INSTALLED ON PHASE 1A PORTION <br />OF THE PROJECT <br />LS <br />1 <br />16 191.00 <br />16 191.00 <br />WCDO81 <br />CREDIT TO COUNTY FOR REDUCTION IN MAST ARM LENGTHS <br />OF SIGNALIZATION POLES AT 66TH AVE & 57TH St <br />LS <br />1 <br />11 283.00 <br />11 283.00 <br />WCDO87 <br />REIMBURSE IRC FOR RESOLUTION TESTING & DEFECTIVE <br />ASPHALT <br />LS <br />1 <br />1079.84 <br />1079.84 <br />WCDO97 <br />ASPHALT PAY QUANTITY ADJUSTMENT (PAY ITEM 337 7 82) <br />LIMIT TO MAX OF 105% OF THE SPREAD RATE <br />LS <br />1 <br />203 612.50 <br />203 612.50 <br />FA <br />FORCE ACCOUNT <br />3,500,000.00 <br />SUBTOTALS <br />.97 <br />66TH AVE (49TH ST - 69TH ST) TOTAL I $ (1,322,311.29) 1 <br />7 <br />RIPubllc Works\ENGINEERING DIVISION PROJECTSM05.66th Ave Wden'mg_49th St to 69th StX1-Admf6Vgenda ItemXProject Closeout%WORKING FOLDERVRC-1505_0ESC OF CHGS CO 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.