Laserfiche WebLink
H. CONTRACTOR has correlated the information known to CONTRACTOR, information and <br />observations obtained from visits to the Site, reports and drawings identified in the Contract <br />Documents, and all additional examinations, investigations, explorations, tests, studies, and <br />data with the Contract Documents. <br />I. CONTRACTOR has given ENGINEER written notice of all conflicts, errors, ambiguities, or <br />discrepancies that CONTRACTOR has discovered in the Contract Documents, and the <br />written resolution thereof by ENGINEER is acceptable to CONTRACTOR. <br />J. The Contract Documents are generally sufficient to indicate and convey understanding of <br />all terms and conditions for performance and furnishing of the Work. <br />K. CONTRACTOR is registered with and will use the Department of un Security's E -Verify <br />system (www.e-verify.gov) to confirm the employment eligibility of all newly hired employees <br />for the duration of this agreement, as required by Section 448.095, F.S. CONTRACTOR is <br />also responsible for obtaining an affidavit from all subcontractors, as required in Section <br />448.095(5)(b), F.S., stating the subcontractor does not employ, contract with, or subcontract <br />with an unauthorized alien. <br />ARTICLE 9 - CONTRACT DOCUMENTS <br />9.01 Contents <br />A. The Contract Documents consist of the following: <br />1. This Agreement (pages 00520-1 to 00520-9, inclusive); <br />2. Notice to Proceed (page 00550-1); <br />3. Public Construction Bond (pages 00610-1 to 00610-3, inclusive); <br />4. Sample Certificate of Liability Insurance (page 00620-1); <br />5. Contractor's Application for Payment (pages 00622-1 to 00622-6 inclusive); <br />6. Certificate of Substantial Completion (pages 00630-1 to 00630-2, inclusive); <br />7. Contractor's Final Certification of the Work (pages 00632-1 to 00632-2, inclusive); <br />8. Professional Surveyor & Mapper's Certification as to Elevations and Locations of the <br />Work (page 00634-1 <br />9. General Conditions (pages 00700-1 to 00700-38, inclusive); <br />10. Supplementary Conditions (pages 00800-1 to 00800-13, inclusive); <br />11. Specifications as listed in Division 1 (General Requirements) and Division 2 (Technical <br />Provisions); <br />12. Drawings consisting of sheets numbered 1 through 139, inclusive, with each sheet <br />bearing the following general title: INDIAN RIVER BOULEVARD PEDESTRIAN & <br />BICYCLE ACCESS IMPROVEMENTS PROJECT. <br />Agreement - 00520 - 5 <br />