My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07/01/2025
CBCC
>
Meetings
>
2020's
>
2025
>
07/01/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/18/2025 12:51:47 PM
Creation date
8/18/2025 12:17:14 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
07/01/2025
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
535
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Board of County Commissioners Draft Meeting Minutes May 20, 2025 <br />9.13 Florida Department of Transportation's SRA1A Bridge Replacement and <br />Indian River County's Artificial Reef Program <br />Kylie Yanchula, Natural Resource Director, was joined by project partners to discuss <br />the State Road AIA (SRAIA) Bridge Replacement project, and the Indian River <br />County Artificial Reef Program. Ian Biava, Consultant Project Manager, in <br />conjunction with FDOT, presented PowerPoint slides with updates on the two parts <br />of the project: replacement of the existing bridge and repaving of SRAIA. The design <br />phase would be completed in June, and construction completion was estimated for <br />Fall 2031. Graphics showed the new bridge design with improvements for the <br />community, and shoreline protections. <br />As an offshoot of the bridge construction, FDOT planned to contribute 3,500 tons of <br />surplus concrete demolition debris to the artificial reef system off the coast of <br />Sebastian. Logan Keneman, Assistant Director of Habitat Restoration with the <br />Coastal Conservation Association (CCA) of Florida, discussed the CCA's <br />partnership with the County to deploy the materials off the coast, and the benefits to <br />the reef system. <br />A motion was made by Commissioner Adams, seconded by Commissioner Moss, <br />to approve staffs recommendation and Resolution 2025-019, authorizing the <br />Chairman's execution of a Locally Funded Agreement (LFA) FM No. <br />445618-1-52-01 with the Florida Department of Transportation (FDOT) for SRAIA <br />Sebastian Inlet bridge replacement surplus concrete demolition debris to be <br />used in the County's Artificial Reef Program. The motion carried by the following <br />vote: <br />Aye: 5 - Chairman Flescher, Vice Chairman Loar, Commissioner Adams, Commissioner <br />Earman, and Commissioner Moss <br />9.H. Release of Retainage for Sector 4 Hurricanes Ian and Nicole Dune <br />Renourishment Project (IRC -2318) <br />Approved staffs recommendation <br />9.1. Work Order No. 2018029-13 - APTIM Sector 5 Pre -Construction and <br />Engineering Services <br />Approved staffs recommendation <br />9.J. Extension of the Transit Service Agreement, Transit Administration Facility <br />Lease, and Main Transit Hub Sublease with Senior Resource Association <br />Approved staffs recommendation and Resolution 2025-020 (Admin), approving a <br />two-year lease with the Senior Resource Administration, Inc., a Florida non-profit <br />corporation, and Resolution 2025-021 (Transit), approving a two-year lease with <br />the Senior Resource Administration, Inc., a Florida non-profit corporation. <br />Indian River County, Florida <br />Page 5 <br />17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.