My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2025-034
CBCC
>
Resolutions
>
2020's
>
2025
>
2025-034
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/3/2025 9:39:49 AM
Creation date
9/2/2025 3:52:32 PM
Metadata
Fields
Template:
Resolutions
Resolution Number
2025-034
Approved Date
08/12/2025
Agenda Item Number
4.B.
Resolution Type
Assessment
Entity Name
Waters Edge II
Subject
Initial Assessment for the replacement of culvert piping
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
"Collection Cost" means the estimated cost to be incurred by the County during <br /> any Fiscal Year in connection with the preparation of the Assessment Roll and collection of <br /> Assessments. <br /> "Collection Cost Component" means the amount computed for each Tax Parcel <br /> pursuant to Section 13(B) hereof. <br /> "Culvert Replacement Project" means a Local Improvement, as defined in the <br /> Ordinance, and more specifically defined as the design, acquisition, construction, and <br /> installation of three Stormwater Culvert Replacements for a total of 256 linear feet of 60- <br /> inch reinforced concrete pipe and other appurtenant facilities located at the intersections of <br /> 37th Drive S.W. and 1st Street S.W. and 36th Court S.W. and 1St Street S.W. and Coouch <br /> Ditch access, including revetment pipe end protection, concrete valley gutter, asphalt <br /> pavement, six-inch watermain, guardrail, traffic striping, and Type C Ditch Bottom Inlet with <br /> 15 linear feet of 15" Polypropylene Stormwater Pipe to provide subdivision access and <br /> stormwater management services to all Tax Parcels located in the MSBU. <br /> "Initial Prepayment Amount" means the amount computed pursuant to Section <br /> 12(A) hereof for each Tax Parcel in the MSBU to prepay the Assessment in full. <br /> "Platted Lot" means a platted lot within the MSBU as of the date of the Final <br /> Assessment Resolution on which a Single-Family Residential Unit has been or can be <br /> constructed or sited in accordance with applicable laws and regulations. <br /> "Project Cost" means (A)the Capital Cost of the Culvert Replacement Project, and <br /> (B)any other costs or expenses related thereto, including administration and notice costs. <br /> 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.