My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2025-034
CBCC
>
Resolutions
>
2020's
>
2025
>
2025-034
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/3/2025 9:39:49 AM
Creation date
9/2/2025 3:52:32 PM
Metadata
Fields
Template:
Resolutions
Resolution Number
2025-034
Approved Date
08/12/2025
Agenda Item Number
4.B.
Resolution Type
Assessment
Entity Name
Waters Edge II
Subject
Initial Assessment for the replacement of culvert piping
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Assessed Property; and (7) the enhancement of environmentally responsible use and <br /> enjoyment of property. <br /> (F) All Tax Parcels within the MSBU are Platted Lots on which a Single-Family <br /> Residential Unit has been or can be sited in accordance with existing policies and <br /> procedures. Given that all such Single-Family Residential Units should generate a <br /> comparable amount of stormwater runoff, it is fair and reasonable to use Platted Lots as the <br /> Assessment Unit and to apportion the Project Cost equally upon all such Platted Lots, <br /> regardless of minor variations in Platted Lot size and the value of the Platted Lots. <br /> (G) Due to the relative small number of property owners in the MSBU compared <br /> to the total Capital Cost and resulting Project Cost and the agreement of the property <br /> owners' association to convey the Culvert Replacement Project to the County, the County <br /> has decided to reduce the annual financial impact the Assessment will have on the real <br /> property owners in the proposed MSBU by providing a fifteen (15)year internal loan to the <br /> real property owners to allow financing for their share of the Capital Cost. <br /> (H) The Board hereby finds and determines that the Assessments to fund the <br /> Culvert Replacement Project provide an equitable method of funding construction of the <br /> project by fairly and reasonably allocating the cost to specially benefitted property, based <br /> upon the number of Platted Lots attributable to each Tax Parcel, in the manner hereinafter <br /> described. <br /> SECTION 4. DESCRIPTION OF PROPOSED MSBU. <br /> (A) The proposed Waters Edge Phase II Subdivision Culvert Replacement <br /> Project Municipal Service Benefit Unit shall include the property included the Waters Edge <br /> 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.