Laserfiche WebLink
CHANGE ORDER NO. 1 <br />DESCRIPTION OF ITEMIZED CHANGES <br />PROJECT NAME: TRAFFIC OPERATIONS FACILITY <br />PROJECT NO. IRC -2104 BID NO. 2023059 <br />�- <br />1tetYi Np.'= <br />D@BCtY ,�1Q11 ..r^ , �,,, ,,. �, r <br />Unit='UnitPrice.- <br />. Pricelncrease <br />0.00 <br />PrieeDecFaaee <br />WCD1 <br />F&I ELECTRONIC CONTROL ACCESS FOR ELEVEN (11) DOORS <br />LS <br />1 <br />38,373.07 <br />38,373.07 <br />WCD3 <br />CONCRETE BLOCK/FENCED DUMPSTER ENCLOSURE <br />LS 1 <br />1 1 <br />20,922.47 <br />20,922.47 <br />WCD4 <br />INSTALL NEW ELECTRIC LINE ENCASED IN PVC 30OLF TO EXISTING <br />EMPLOYEE PARKING LIGHTS <br />LS <br />1 <br />2,420.72 <br />2,420.72 <br />WCD5 <br />F&I REVISED DOOR HARDWARE <br />LS <br />1 <br />1,291.50 <br />1,291.50 <br />WCD6 <br />F&I ELECTRONIC CONTROL ACCESS (ELECTRONIC HINGES, <br />ELECTRONIC DOOR LOCKS AND STRIKE PLATES AND PANIC BARS) <br />LS <br />1 <br />23,122.00 <br />23,122.00 <br />WCD7 <br />PROVIDE MATERIAL & LABOR TO INSTALL CEILING OUTLETS <br />LS <br />1 <br />694.29 <br />694.29 <br />WCD8 <br />ADD INTERIOR WINDOW & FRONT ENTRY SCONCE LIGHTS <br />LS <br />1 <br />2,714.47 <br />2,714.47 <br />WCD9 <br />PROVIDE MATERIAL & LABOR FOR PUSH BUTTON AT DOOR 100A <br />LS <br />1 <br />8,324.40 <br />8,324.40 <br />WCD10 <br />REPLACE #10 WIRE, 30 AMP BREAKER AND 30 AMP DISCONNECT <br />AND REPLACE <br />LS <br />1 <br />1,858.21 <br />1,858.21 <br />WCD11 <br />F & I DOUBLE DRIVE SWING GATE SYSTEM <br />LS <br />1 <br />63,332.33 <br />63,332.33 <br />WCD12 <br />REMOVE PORTION OF SIDEWALK & REPLACE - SHIFT RAMP TO <br />MEET ADA REQUIREMENTS <br />LS <br />1 <br />5,120.25 <br />5,120.25 <br />WCD13 <br />VOID <br />0.00 <br />WCD14 <br />F&I 8 CAMERA BOXES & ALL WIRING FROM IT ROOM TO <br />CAMERA LOCATIONS <br />LS <br />1 <br />7,052.33 <br />7,052.33 <br />WCD15 <br />NO CHARGE <br />WCD16 <br />REMOVE BREAKROOM FAUCET & F&I MOEN MODEL 118792 TWO <br />HANDLE HIGH ARC KITCHEN FAUCET <br />LS <br />1 <br />372.75 <br />372.75 <br />WCD17 <br />F & I ADD'L PIPING TO RECIRCULATING LINE TO ALLOW WATER <br />TO GET HOTTER FASTER <br />LS <br />1 <br />1,407.00 <br />1,407.00 <br />WCD18 <br />REMOVE EXISTING OAK TREE & F & I NEW CONDUIT FOR FIBER <br />OPTIC LINE RELOCATION <br />LS <br />1 <br />4,676.71 <br />4,676.71 <br />WCD19 <br />F&I NEW ELECTRICAL FLOOR BOX COVER W/SINGLE HOLE FOR <br />CONNECTION WIRING <br />LS <br />1 <br />359.16 <br />359.16 <br />WCD20 <br />ADDITIONAL GENERAL REQUIREMENT COSTS INCLUDING <br />BUILDERS RISK INSURANCE FOR DELAYS SIX (6) OCCURRENCES <br />LS <br />1 <br />26,583.18 <br />26,583.18 <br />WCD21 <br />MODIFY EXISTING WATER SERVICE <br />LS <br />1 <br />50,872.30 <br />50,872.30 <br />WCD22 <br />F&I LIGHT MOUNT INSTEAD OF LIGHT POLE REPLACE INTERIOR <br />SIGN FOR ROOM 10S/INSTALL BLDG PLAQUE <br />LS <br />1 <br />6,685.37 <br />6,685.37 <br />WCD23 <br />STRONGER FINISH - F&I 5 NARROW LITE WINDOW KITS & <br />GLASS AT DOORS MANUAL WATERING TREES <br />LS <br />1 <br />10 819.49 <br />10 819.49 <br />590-1 <br />LANDSCAPE - IRRIGATION SYSTEM, MODIFICATION <br />LS <br />1 <br />32,546.66 <br />28,478.33 <br />344 -FA <br />FORCE ACCOUNT <br />LS <br />1 <br />600,000.00 <br />600,000.00 <br />SUBTOTALS <br />1 <br />277,002.00 <br />628,478.33 <br />TRAFFIC OPERATIONS FACILITY TOTAL <br />$ (351,476.33) <br />V:PW WorksIENGINEERINGDIVISIONPRQIECTSUINTmft CPS ftrr Propd CbWUMO1 Bw"YRC-2104=_CESC CKANGES <br />