My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2025-158
CBCC
>
Official Documents
>
2020's
>
2025
>
2025-158
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/11/2025 2:43:40 PM
Creation date
9/11/2025 2:42:23 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
08/19/2025
Control Number
2025-158
Agenda Item Number
9.Q.
Entity Name
CPZ Architects, Inc.
Subject
Architecture Services Work Order 3 for IRC Administration Bg. B 2nd Floor West Side Office Build Out
– Human Resources
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
M L Engineering Inc. <br />2030 37`h Avenue <br />Vero Beach, FL 32960 <br />Phone: (772) 569-1257 <br />Fax: (772) 569-4041 <br />August 5, 2025 <br />Mr. Paul Arciero, NCARB <br />CPZ Architects, Inc. <br />4316 West Broward Blvd. Suite 201 <br />Plantation, FL 33317 <br />Re: IRC Administration Bldg B — Folding Partition <br />180027 1h Street <br />Vero Beach, FL 32960 <br />Engineer's Proposal <br />Dear Paul: <br />We are pleased to provide you with this proposal for structural engineering consulting services for the <br />above project. Our scope of work will be to design and prepare the structural documents for supporting <br />the proposed folding stackable partition wall. <br />Scope of Work <br />Phase I Design Documents <br />1. Site visit to assess the existing construction <br />2. Review available existing building plans <br />3. Coordination with CPZ Architects <br />4. Design and prepare the structural documents to include the following: <br />a. Framing plan, details, and specifications. <br />b. Sections, Details, and Schedules. <br />c. Miscellaneous structural details as required. <br />5. Structural notes and specifications in short format on drawings. <br />6. Signed and sealed documents as required for permit submittal. <br />Phase II Construction Administration <br />1. Structural submittal review <br />2. (1) site visit for construction observation <br />Note: <br />The following services are not included in our scope of work: <br />1. Material & Laboratory Testing <br />2. Demolition for exploratory assessment <br />3. Permit Application and Fees <br />M. I temp)CPZ architects URC admin bldg folding Partition IProIIRC Admin Folding wall-08.05.25.docx <br />
The URL can be used to link to this page
Your browser does not support the video tag.