Laserfiche WebLink
Item Number Item <br />#1-1 T -Dock Rebuild <br />#1-2 Permits <br />#1-3 5' 4X4 post to be installed between pilings to support railings <br />#1-4 2X8 blocking to support the 04 post <br />#1-5 Stringer Replacement (if needed) <br />#1-6 Cross Member Replacement (if needed) <br />#1-7 _ -Piling Replacement (if needed) <br />#2-1 T -Dock Rebuild w/Fibergrate MicroMesh Decking (including additional structural components required to support decking) <br />02-2 Permits <br />#2-3 5' 4X4 post to be installed between pilings to support railings <br />#2-0 2X8 blocking to support the 04 post <br />#2-5 Stringer Replacement (if needed) <br />#2-6 Cross Member Replacement (if needed) <br />112-7 Piling Replacement (if needed) <br />Quantity Required Unit <br />Unit Price Totals <br />1 Lump Sum <br />37000 $37,000.00 <br />1 Lump Sum <br />1200 $1,200.00 <br />49 each <br />70 $3,430.00 <br />186 LF <br />20 $3,720.00 <br />248 LF <br />8.75 $2,170.00 <br />160 LF <br />15 $2,400.00 <br />80 LF <br />55 $4,400.00 <br />_ 7 $54,320.00 <br />1 Lump Sum <br />79000 $79,000.00 <br />1 Lump Sum <br />1200 $1,200.00 <br />49 each <br />70 $3,430.00 <br />186 LF <br />20 $3,720.00 <br />248 LF <br />8.75 $2,170.00 <br />160 LF <br />15 $2,400.00 <br />80 LF <br />55 $4,400.00 <br />$96,320.00 <br />