Laserfiche WebLink
Item Item No. Description Qua Unit Unit Price <br />#0-1 <br />101-1-1 <br />Mobilization/ Demobilization, Poly Pipe <br />1 LS <br />1000 <br />#0-2 <br />101-1-2 <br />Mobilization/ Demobilization, RCP <br />1 LS <br />1500 <br />#0-3 <br />102-1 <br />Maintenance of Traffic <br />1 LS <br />2000 <br />#0-4 <br />102-4 <br />Pedestrian or Bicycle Special Detour <br />1 SY <br />350 <br />#0-5 <br />102-5 <br />Pedestrain Escort/Flagger <br />1 HR <br />70 <br />#0-6 <br />102-14 <br />Traffic Control Officer <br />1 HR <br />100 <br />#0-7 <br />102-60 <br />Work Zone Sign <br />1 DY <br />2 <br />#0-8 <br />102-61 <br />Buisness Sign <br />1 EA <br />55 <br />#0-9 <br />102-62 <br />Barrier Mounted Work Zone Sign <br />1 DY <br />3 <br />#0-10 <br />102-71-16 <br />Temporary Barrier <br />1 LF <br />65 <br />#0-11 <br />102-73 <br />Temporary Guardrail <br />1 LF <br />50 <br />#0-12 <br />102-74-1 <br />Channelizing Device <br />1 DY <br />0.5 <br />#0-13 <br />102-75 <br />Temporary Lane Separator <br />1 LF <br />40 <br />#0-14 <br />102-76 <br />Arrow Board <br />1 DY <br />30 <br />#0-15 <br />102-78 <br />Temporary Raised Pavement Markers <br />1 EA <br />5 <br />#0-16 <br />102-99 <br />Portable Changeable Message Sign <br />1 DY <br />55 <br />#0-17 <br />102-115 <br />Type III Barricade <br />1 DY <br />1 <br />#0-18 <br />102-120 <br />Temporary Signal for Lane Closures on Two -Lane, <br />1 DY <br />125 <br />#0-19 <br />102-150 <br />Portable Regulatory Sign <br />1 DY <br />25 <br />#0-20 <br />102-909 <br />Temporary Raised Rumble Strips <br />1 DY <br />50 <br />#0-21 <br />102-913-11 <br />Removeable Tape, Black 6" <br />1 GM <br />5 <br />#0-22 <br />102-913-21 <br />Removeable Tape, White 6" <br />1 GM <br />5 <br />#0-23 <br />102-913-31 <br />Removeable Tape, Yellow 6" <br />1 GM <br />5 <br />#0-24 <br />104-10-3 <br />Sediment Barrier <br />1 LF <br />4 <br />#0-25 <br />104-11 <br />Floating Turbidity Barrier <br />1 EA <br />500 <br />#0-26 <br />104-15 <br />Soil Tracking Prevention Device <br />1 EA <br />500 <br />#0-27 <br />104-18 <br />Inlet Protection System <br />1 EA <br />200 <br />#0-28 <br />110-1-1 <br />Clearing and Grubbing <br />1 AC <br />10000 <br />#0-29 <br />110-2-2 <br />Selective Clearing and Grubbing, Areas with Tree! <br />1 AC <br />5000 <br />#0-30 <br />110-4-10 <br />Removal of Existing Concrete <br />1 SY <br />120 <br />#0-31 <br />110-4-1 <br />Removal of Riprap Slope Protection <br />1 SY <br />120 <br />#0-32 <br />120-1 <br />Regular Excavation <br />1 CY <br />10 <br />#0-33 <br />120-4 <br />Subsoil Excavation <br />1 CY <br />12 <br />#0-34 <br />120-6 <br />Embankment <br />1 CY <br />15 <br />#0-35 <br />121-70 <br />Flowable Fill <br />1 CY <br />500 <br />#0-36 <br />160-4 <br />Type B Stabilization (LBR-40) (12") <br />1 SY <br />150 <br />#0-37 <br />285-711 <br />Cemented Coquina (LBR 100) (12") <br />1 SY <br />185 <br />#0-38 <br />286-1 <br />Asphalt Apron/Driveway Construction <br />1 SY <br />180 <br />#0-39 <br />327-70-1 <br />Asphalt Pavement Milling (1") <br />1 SY <br />195 <br />#0-40 <br />334-1-53A <br />Superpave Asphalt Concrete (SP -9.5) (Traffic C) (F <br />1 TN <br />350 <br />#0-41 <br />334-1-53B <br />Superpave Asphalt Concrete (SP -12.5) (Traffic C) 1 <br />1 TN <br />385 <br />#0-42 <br />430-175-112 Pipe Culvert (Polypropylene) Round (12" S/CD) <br />1 LF <br />95 <br />#0-43 <br />430-175-115 Pipe Culvert (Polypropylene) Round (15" S/CD) <br />1 LF <br />135 <br />#0-44 <br />430-175-124 Pipe Culvert (Polypropylene) Round (24" S/CD) <br />1 LF <br />280 <br />