Laserfiche WebLink
Items Description <br />101-1 MOBILIZATION / DEMOBILIZATION <br />102-1 MAINTENANCE OF TRAFFIC <br />104-2 PREVENTION, CONTROL, & ABATEMENT OF EROSION & WATER POLLUTION <br />522-2 CONCRETE SIDEWALK (6" THICK, REMOVE & REPLACE) <br />570.1-2 PERFORMANCE TURF (SOD) (BAHIA) <br />630-2-11 CONDUIT (F&I) (OPEN TRENCH) (2-2" HDPE) <br />630-2-12 CONDUIT (F&I) (DIRECTIONAL BORE) (2-2" HDPE) <br />635-2-12 PULL & SPLICE BOD (F&I) (24"X36") <br />635-2-12A PULL & SPLICE BOX (F&I) (24"X36") (HEAVY DUTY) <br />635-2-15 PULL & SPLICE BOX (F&I) (48"X30") <br />635-2-15A PULL & SPLICE BOX (F&1) (48"X30") (HEAVY DUTY) <br />999-1 ASBUILT SURVEYING AND RECORD DRAWING PREPARATION (BY REGISTGERED SURVEYOR) <br />New Tech Construction Corp <br />Total Cost $ 491,197.0 <br />Selected # 0 <br />Selected ($) $ 0 <br />Unit Quantity Required UnitPrice TotalCost <br />LS 1 <br />$ 10,382.0 <br />$ 10,382.0 <br />LS 1 <br />$ 18,000.0 <br />$ 18,000.0 <br />LS 1 <br />$ 11,000.0 <br />$ 11,000.0 <br />SY 400 <br />$ 150 <br />$ 60,000.0 <br />SY 800 <br />$ 3.25 <br />$ 2,600.0 <br />LF 60 <br />$ 100 <br />$ 6,000.0 <br />LF 18040 <br />$ 19.75 <br />$ 356,290.0 <br />EA 17 <br />$ 500 <br />$ 8,500.0 <br />EA 10 <br />$ 650 <br />$ 6,500.0 <br />EA 5 <br />$ 675 <br />$ 3,375.0 <br />EA 5 <br />$ 750 <br />$ 3,750.0 <br />LS 1 <br />$ 4,800.0 <br />$ 4,800.0 <br />Ir <br />