My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2025-182
CBCC
>
Official Documents
>
2020's
>
2025
>
2025-182
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/21/2025 2:38:23 PM
Creation date
10/21/2025 2:35:04 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Amendment
Approved Date
09/09/2025
Control Number
2025-182
Agenda Item Number
9.Q.
Entity Name
Kimley-Horn and Associates, Inc.
Subject
Amendment 2 to Work Order 6 for Services Related to Gifford Elevated Storage Tank Rehabilitation
and Structural Upgrade Phase 2
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Consultant will review Contractor furnished shop drawings, which may include product <br />specifications for materials required for construction. This scope assumes that up to <br />three (3) shop drawing submittals will be required as part of the proposed work: <br />hurricane preparedness plan, schedule of values/schedule/earned value schedule, <br />coating schedule. <br />Consultant will review Contractor Applications for Payment. Consultant will make <br />recommendations to Owner with respect to payment based on Consultant's observations <br />and overall progress of the work. Consultant assumes two (2) payment application <br />reviews will be required. <br />Consultant will provide on-site construction observation services during the <br />construction phase. Consultant will attend one site visit during the expected 8 -week <br />construction duration in order to observe the progress of the Work. Such visits and <br />observations by the Consultant are not intended to be exhaustive or to extend to every <br />aspect of Contractor's work in progress. Observations are to be limited to spot <br />checking, selective measurement, and similar methods of general observation of the <br />work based on Consultant's exercise of professional judgment. Based on information <br />obtained during such visits and such observations, Consultant will evaluate whether <br />Contractor's work is generally proceeding in accordance with the Contract Documents, <br />and Consultant will keep IRCDUS informed of the general progress of the Work. <br />The purpose of our site visits will be to enable us to better carry out the duties and <br />responsibilities specifically assigned in this Agreement to Consultant, and to provide the <br />IRCDUS a greater degree of confidence that the completed work will conform in <br />general to the Contract Documents. Consultant shall not, during such visits or as a <br />result of such observations of Contractor's work in progress, supervise, direct, or have <br />control over Contractor's work, nor shall we have authority over or responsibility for the <br />means, methods, techniques, equipment choice and usage, sequences, schedules, or <br />procedures of construction selected by Contractor, for safety precautions and programs <br />incident to Contractor's work, nor for any failure of Contractor to comply with laws and <br />regulations applicable to Contractor's furnishing and performing the Work. <br />Accordingly, Consultant neither guarantees the performance of any Contractor nor <br />assumes responsibility for any Contractor's failure to furnish and perform their work in <br />accordance with the Contract Documents. <br />Once the Contractor considers the work to be substantially complete, and in addition to <br />the (1) site visit, the Consultant will attend one (1) additional punch list walk through <br />with the Contractor and Owner. Consultant will furnish "punch list" that identifies the <br />remaining work to complete the project. <br />Upon completion of punch list, Consultant will perform a final site visit. Consultant <br />will review Contractor furnished closeout documentation and if applicable, make <br />recommendation for final payment and project closeout. <br />K:\WPB_Civil\GeneralTing\Marketing\IRCDUS\Gifford Water Tank Phase 2\2025.0811 - Gifford Water Tank Modification - <br />Scope.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.