Laserfiche WebLink
Objective 5: By 2022, the county will have completed the sanit . pr-evements listed in the <br />cou-PAy's 5 year- Capital impr-evements Program in er-der- to m im-�zle. Use of existing facilities an-, <br />diseoufage ufban sprawl (euffefA Five Year- Capital hnipfevements Plan is in the Capital Impfevemen <br />Eleme^+ of the eemp,-ehe sive plan) The County shall maintain a 5 -year Capital Improvements Program <br />identify sg anitary sewer improvements to maximize the use of existing facilities and discourage urban <br />sprawl. <br />Poliey .. , <br />the eounty <br />shall maintain a five yeEff sehedttle of eapital ifnpr-evemefA needs fef pablie faeilifie�. [Addressed in <br />separate Element] <br />Policy 5.3: , <br />take the fIter 'steps: <br />- begin planning and pfelifninary design fef expansion when a plant's Aver -age Daily Demand IS, <br />- pfepafe plans and speeifieations fo v -hen a plant's Avefage Daily Demand is pfejeeted <br />equal Of exceed– its eapaeit , within 4—yeah <br />Pfeteetion fef expansion when a plant's Avefage Daily Demand is pr-qjeeted to equal of exceed <br />eapacity within 3 years; an <br />Daily Demand is projected to equal of emeeed its eapaeity within 6 Mefithsz <br />The County will comply with FDEP requirements for evaluating capacity and planning for future <br />improvements as needed to provide sanitary sewer service at the committed Level of Service. <br />Policy 5.9. The e f+., shall install ,,.,4,,...afie air -release valve.. ; all new sewer iines. The County shall <br />require installation of automatic air and vacuum valves on all new sewer lines where County deems <br />necessary and appropriate. <br />Poliey 6.4! To ensufe proper- maintenance and oper-atien, the DEP shall inspeet all package tfeatment <br />plants on an amvual ba [Uneccessary policy] <br />Policy 6.5: The eCounty shall require all new package wastewater treatment plants to be built according <br />to current federal, state, and county requirements. In addition to obtaining a county permit demonstrating <br />compliance with county regulations, any developer building and operating a package wastewater <br />treatment plant must obtain a state permit demonstrating compliance with state and federal regulations. <br />These r-egulations inelude W4 are not limited to the Feder -a! Water- Pellu4iefi Control Aet of 1972 (P -L <br />92 500) and its amendments tkough the Clean Water Aets of 1977 (PL 95 217) and 1981 (PL 97 147+, <br />Code. Both state and eetmty peFmits are r-equir-ed for- the eenstruction of a plant, and for- any ftau <br />ff .a;fieatio of plapA. [Incorporate stricken language into LDR] <br />Poliey 6.7: The eou*ty shall continue to eafer-ee ordinances requiring pr -e tTeatment of cenvner-cial <br />industrial waste before discharge into the county system. [Policy 6.7 Relocated to Objective I <br />Objective 7: By 2020, the number of new septie systems pefmitted annually will not exeeed 200. The <br />County will coordinate with FDEP and the appropriate regulating agencies to limit and discourage the <br />number of new septic systems permitted annually. <br />C:\Users\ufc-prod\AppData\Local\Temp\BCL Technologies\easyPDF 8\@BCL@6414E534\@BCL@6414E534.docx 19 <br />25 <br />