My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08/12/2025 (2)
CBCC
>
Meetings
>
2020's
>
2025
>
08/12/2025 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/23/2025 12:16:12 PM
Creation date
10/23/2025 11:43:54 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Special Call Meeting
Document Type
Agenda Packet
Meeting Date
08/12/2025
Meeting Body
Board of County Commissioners
Subject
2025 Indian River County Comprehensive Plan Evaluation and Appraisal Report (EAR) based Amendments
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
263
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Policy 1.4: Ne -A development project shall be approved for purposes of transportation concurrency if <br />the projected impacts of the project does not would serve reduce service levels of any roadway on the <br />traffic circulation system below the standards identified in Policy 1.1, or if proportionate share for the <br />identified roadway improvement is provided. Conditions applicable to this policy are as follows: <br />Development projects shall be defined as any activity,—which requires issuance of a development <br />order. This includes. comprehensive plan amendment, rezonings, site plan approval, preliminary <br />plat approval, preliminary PD approval, DRI development order approval, preliminary PD <br />approval, and DRI development order approval. <br />Projected project traffic shall be based on the application of ITE trip rates (Trip Generation, 12 -7th <br />Edition or subsequent editions), Indian River County trip rates, or applicant derived/county <br />approved trip rates for the proposed use(s) to the project. <br />• Existing service level will be derived by using the peak hour/peak season/peak direction traffic <br />volume ranges. Volume shall be the sum of existing demand plus committed demand. This is <br />described in the concurrency management system component of the Capital Improvements <br />Element. <br />Capacity shall be calculated as specified in the state road category of the appropriate table in the <br />most current version of Florida's Level of Service Handbook, using peak hour/peak season/peak <br />direction default table assumptions and appropriate adjustment factors. As an alternative, <br />capacity may be determined by ART -PLAN analysis, HCM analysis, speed delay studies, or <br />other generally accepted capacity determination methodology approved by the Public Works <br />Director. For capacity determination purposes, a roadway improvement may be considered to <br />be in place and the capacity to be provided by the improvement may be counted as available if <br />the referenced improvement is listed in the first three years of the county's adopted five Year <br />Schedule of Capital Improvements (appendix A of the Capital Improvements Element) or in the <br />first three years of the adopted Florida Department of Transportation five year work program, is <br />scheduled to be under construction not more than three years after issuance of the project's first <br />building permit, and where the county issues a development order for the project needing the <br />improvement approving this allowance. <br />If based on the above analysis the proposed development does not meet approval requirements, the <br />developer may choose to conduct a more detailed traffic impact analysis as described in Policy 1.5. <br />Policy 1.5: The eCounty through its land development regulations, shall require submission of a traffic <br />impact study for all projects prejeeted to ge arae'^ arae* ^nn ^ more aver—age daily trips. in compliance <br />with Code of Ordinances Chapter 952: <br />Y. <br />.. EM -3 <br />IN W."MM. <br />_ 1 ff:r-MA <br />C:\Users\ufc-prod\AppData\Local\Temp\BCL TechnologieAeasyMF 8\@BCL@6414E534\@BCL@6414E534.docx 39 <br />45 <br />
The URL can be used to link to this page
Your browser does not support the video tag.