My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2025-213A
CBCC
>
Official Documents
>
2020's
>
2025
>
2025-213A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/10/2025 12:03:37 PM
Creation date
11/3/2025 11:56:38 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
10/07/2025
Control Number
2025-213A
Agenda Item Number
9.G.
Entity Name
Kimley-Horn & Associates, Inc.
Subject
Work Order 22 for Facilities Electrical Improvements and Standby Power
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C&W Ref. 256618 <br />information aligned with the tasks outlined in this proposal. We anticipate that IRCDUS staff <br />will provide plans of the existing facilities, which will serve as the foundational reference for our <br />investigation. <br />The facilities selected for visitation and evaluation as part of this assessment study include: <br />• Hobart WTP and supporting wellfield <br />• Oslo Road WTP and supporting wellfield <br />• Kings Highway Elevated Storage <br />• North Beach Storage and Repump Facility <br />• Roseland Elevated Storage and Repump Facility <br />• Gifford Wastewater Treatment Facility <br />• South Wastewater Treatment Facility <br />• West Wastewater Treatment Facility <br />• Residuals Dewatering Facility (Landfill) <br />• 77th Avenue Repump Station <br />• 77th Avenue Reclaim Water Pump Station <br />Task 1: Preliminary Engineering Due Diligence: <br />We will conduct a single site visit to each of the eleven (11) facilities as part of this <br />assessment. The field investigation is anticipated to span three days, during which we wil <br />document existing conditions and collect relevant site data. <br />At both the Oslo and Hobart Water Treatment Facilities, we will include evaluations of their <br />associated wellfields. Special attention will be given to well sites that lack backup power from <br />the plant's emergency generator. Additionally, we will update the 2022 emergency power <br />evaluation previously performed for the Hobart remote wells. <br />At the Oslo site, we will specifically assess wells S-5, S-6, and S-7 to support a proposed <br />centralized emergency generator installation. <br />We will prepare a draft report summarizing our findings and presenting recommended actions. <br />As part of this report, we will include an updated evaluation of the emergency power systems <br />for the remote well sites associated with the Hobart Water Treatment Facility, revisiting and <br />refining the assessment originally conducted in 2022. <br />Task 2: Facility Lightning Protection and Grounding Evaluation: <br />We will observe and document the existing lightning protection and grounding systems across <br />all designated facilities and structures, including the level of surge protection currently in place <br />
The URL can be used to link to this page
Your browser does not support the video tag.