My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09/09/2025
CBCC
>
Meetings
>
2020's
>
2025
>
09/09/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/7/2025 12:13:04 PM
Creation date
11/7/2025 11:01:37 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
09/09/2025
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
529
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Stormwater Sub-Element: <br /> Indian River County's third major Element is comprised of five (5) sub-elements, which altogether are <br /> commonly referred to as an Infrastructure Element. The purpose of the Infrastructure Element is to <br /> ensure the availability of wastewater, potable water, solid waste, natural groundwater, and stormwater <br /> facilities to meet the existing and projected demands within the County. The Infrastructure Element <br /> establishes level of service standards and aims to effectively manage growth and maintain environmental <br /> quality while providing safe and adequate facilities for residents and visitors. The fifth sub-element of <br /> the Infrastructure Element is the Stormwater sub-element. <br /> A summary of the changes that are proposed for the Stormwater Sub-Element are as follows <br /> 0 Update terminology(e.g., drainage system to stormwater management system) <br /> 0 Reframe County goals to be achieved "to the maximum extent practical"rather than setting all <br /> or nothing goals <br /> 0 Remove specific standards that can or should be referenced in other official documents, such as <br /> the County Code or engineering documents <br /> 0 Revise or remove GOPs related to proposed improvements or activities which have already been <br /> accomplished. Indicate whether the program is ongoing or define the new goal date <br /> 0 Verify consistency within the sub-element, such as between Policy 3.1 and Policies 2.9 and 2.10 <br /> 0 Consider developing a funding plan as part of a Stormwater Master Plan for the County <br /> 0 Ensure consistency with State standards <br /> 0 Collaborate with appropriate agencies to develop and implement plans for surface water <br /> management projects <br /> These recommended changes and updates to the Stormwater Sub-Element are important to ensure the <br /> prevention of runoff pollution and reduce flooding within the community. <br /> Goal: Indian River County shall provide and maintain : • - •• . . - - - .: <br /> . •- - . . ' ::: : :• - ., _ - - . . an efficient and effective stormwater management system <br /> which, to the maximum extent practical, provides proper floodplain management; reduces risk of <br /> property damage and promotes personal safety; promotes stormwater recharge of the shallow aquifer; <br /> minimizes erosion and water quality degradation; and reduces stormwater pollutant loading of the Indian <br /> River Lagoon and receiving waters. <br /> Objective 1: : ., • _ •• . : ., . - .: - - -- ..- - .. . _. - •. : <br /> .. - - ' ... • . • . . . - - . To the maximum extent <br /> practical where attainable,by 2030,the County shall actively manage a floodplain program to minimize <br /> flood risk for existing development within the unincorporated section of Indian River County. New <br /> developments will continue to meet current or more stringent regulations as may be passed from time to <br /> time. <br /> C:\Granicus\Legistar5\L5\Temp\9ec5cab0-071a-4938-8838-22e53bcab073.docx 33 <br /> 243 <br />
The URL can be used to link to this page
Your browser does not support the video tag.