My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2025-234
CBCC
>
Official Documents
>
2020's
>
2025
>
2025-234
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/10/2025 12:18:09 PM
Creation date
11/10/2025 12:17:22 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Settlement Agreement
Approved Date
10/21/2025
Control Number
2025-234
Agenda Item Number
9.G.
Entity Name
State of Florida Department of Environmental Protection (FDEP)
Subject
Consent Order/Settlement Agreement 22-0150 For the Indian River County
Department of Utility Services Wastewater Collection System
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DEP vs. Indian River County <br />Settlement Agreement, OGC No. 22-0150 <br />Page 19 <br />Air Emissions <br />Total Annual Cost Savings = <br />Total Annual Avoided Cost Savings = <br />C. Project Cost: (Include per Project the itemized, subtotal and Project total costs. A <br />projected payback period in months or years needs to be included. <br />Provide a grand total cost for all Projects and an averaged projected payback period, for <br />multiple Projects. Use list or table format for all.) <br />D. Project Reporting: <br />1. Within 30 days of completing the P2 Project, the Respondent shall submit <br />to the Department a P2 Project Final Report that includes the following: <br />a. A confirmation that the information presented in Sections A -C of <br />the Summary is unchanged, or an updated version with the sections changed <br />appropriately. A statement that the Project(s) was/were implemented successfully. An <br />explanation of any problems encountered and corrections applied. A statement <br />indicating the date the Project was started and also the date completed. <br />b. Attached expense reports, receipts, purchasing instruments and <br />other documents itemizing costs expended on preparing and implementing the Project. <br />2. The Department shall review the Final Report and determine: <br />a. Whether the project was properly implemented; and <br />b. Which expenses apply toward pollution prevention credits. <br />3. A $1.00 pollution prevention credit for each $1.00 spent on applicable <br />costs will be applied against the portion of the civil penalty that can be offset. <br />a. The following costs are applicable as P2 credits toward the civil <br />penalty offset amount: <br />i. Preparation of the P2 Project; <br />ii. Design of the P2 Project; <br />iii. Installation of equipment for the P2 Project; <br />iv. Construction of the P2 Project; <br />v. Testing of the P2 Project; <br />vi. Training of staff concerning the implementation of the P2 <br />Project; and <br />vii. Capital equipment needed for the P2 Project. <br />b. The following costs shall not apply as P2 credits toward the civil <br />penalty offset amount: <br />P2 Project; <br />i. Costs incurred in conducting a waste audit; <br />ii. Maintenance and operation costs involved in implementing the <br />iii. Monitoring and reporting costs; <br />
The URL can be used to link to this page
Your browser does not support the video tag.