Laserfiche WebLink
ARTICLE 7 - INDEMNIFICATION <br /> 7.01 CONTRACTOR shall indemnify OWNER, ENGINEER, and others in accordance with <br /> paragraph 6.20 (Indemnification) of the General Conditions to the Construction Contract. <br /> ARTICLE 8 - CONTRACTOR'S REPRESENTATIONS <br /> 8.01 In order to induce OWNER to enter into this Agreement CONTRACTOR makes the <br /> following representations: <br /> A. CONTRACTOR has examined and carefully studied the Contract Documents and the <br /> other related data identified in the Bidding Documents. <br /> B. CONTRACTOR has visited the Site and become familiar with and is satisfied as to the <br /> general, local, and Site conditions that may affect cost, progress, and performance of the <br /> Work. <br /> C. CONTRACTOR is familiar with and is satisfied as to all federal, state, and local Laws and <br /> Regulations that may affect cost, progress, and performance of the Work. <br /> D. CONTRACTOR has carefully studied all: (1) reports of explorations and tests of subsurface <br /> conditions at or contiguous to the Site and all drawings of physical conditions in or relating to <br /> existing surface or subsurface structures at or contiguous to the Site (except Underground <br /> Facilities) which have been identified in the Supplementary Conditions as provided in <br /> paragraph 4.02 of the General Conditions and (2) reports and drawings of a Hazardous <br /> Environmental Condition, if any, at the Site which have been identified in the Supplementary <br /> Conditions as provided in paragraph 4.06 of the General Conditions. <br /> E. CONTRACTOR has obtained and carefully studied (or assumes responsibility for having <br /> done so) all additional or supplementary examinations, investigations, explorations, tests, <br /> studies, and data concerning conditions(surface, subsurface, and Underground Facilities) at <br /> or contiguous to the Site which may affect cost, progress, or performance of the Work or <br /> which relate to any aspect of the means, methods, techniques, sequences, and procedures <br /> of construction to be employed by CONTRACTOR, including applying the specific means, <br /> methods, techniques, sequences, and procedures of construction, if any, expressly required <br /> by the Contract Documents to be employed by CONTRACTOR, and safety precautions and <br /> programs incident thereto <br /> F. CONTRACTOR does not consider that any further examinations, investigations, <br /> explorations, tests, studies, or data are necessary for the performance of the Work at the <br /> Contract Price, within the Contract Times, and in accordance with the other terms and <br /> conditions of the Contract Documents. <br /> G. CONTRACTOR is aware of the general nature of work to be performed by OWNER and <br /> others at the Site that relates to the Work as indicated in the Contract Documents. <br /> H. CONTRACTOR has correlated the information known to CONTRACTOR, information and <br /> observations obtained from visits to the Site, reports and drawings identified in the <br /> Contract Documents, and all additional examinations, investigations, explorations, tests, <br /> studies, and data with the Contract Documents. <br /> Agreement-00520-4 <br />