My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2025-244
CBCC
>
Official Documents
>
2020's
>
2025
>
2025-244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/10/2025 1:26:22 PM
Creation date
11/10/2025 1:25:07 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
10/21/2025
Control Number
2025-244
Agenda Item Number
13.F.2.
Entity Name
Aptim Environmental & Infrastructure, LLC
Subject
Work Order 3 2018029-14 Sector 5 Hurricanes Ian and Nicole Construction Administration
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
,, APTIM <br />Task 5: Project Closeout <br />A TRUE COPY <br />CERTIFICATION ON LAST PAGE <br />RYAN L. BUTLER, CLERK <br />October 8, 2025 <br />Page 4 of 7 <br />APTIM will conduct one (1) substantial completion site visit with the County and Contractor, which will be <br />conducted following dune and beach fill placement. Upon completion of the substantial completion site <br />visit, APTIM will assist the County in the preparation of a punch list of items to be completed by the <br />Contractor prior to final acceptance. APTIM will conduct one (1) final acceptance walkthrough with the <br />County following site restoration, installation of dune vegetation, and demobilization. This final site visit <br />will be conducted to confirm that the Contractor has completed the punch list items. <br />Deliverable <br />APTIM will prepare and distribute a punch list to the project team upon finishing the substantial completion <br />site visit. A letter summarizing recommendations for final payment to the Contractor and release of any <br />retainage will be prepared at the completion of the project. <br />Schedule <br />APTIM will conduct the substantial completion site visit within seven (7) days of the receipt of written <br />notice from the Contractor of substantial completion. APTIM will conduct the final walkthrough within <br />seven (7) days of receipt of written notice from the Contractor that all punch list items have been <br />completion. <br />Cost <br />The lump sum cost for this task is $5,385.60. <br />Task 6: Project Report & Certification <br />After completion of the project and the Contractor has demobilized from the site, APTIM will provide a <br />written Project Completion Report to the County, which will include a summary of the work performed <br />along with a compilation of the pertinent correspondence and data. APTIM will provide a written statement <br />of completion and certification to satisfy permitting requirements noting any deviations from the permitted <br />projects. This certification will state whether the project was constructed in substantial compliance with <br />the plans and specifications. Our certification will be qualified and based on the extent of APTIM's <br />involvement in construction observation. <br />Deliverable <br />APTIM will provide one (1) hard copy of the Project Completion Report and written statement of <br />completion to the County; electronic copies in PDF format will also be provided. <br />Schedule <br />The Project Completion Report will provided within approximately sixty (60) days after completion and <br />acceptance of construction as required by the permit. The written statement of completion and <br />certification will provided within thirty (30) days after completion and acceptance of construction <br />authorized by the permit. <br />Cost <br />The lump sum cost for this task is $8,222.00. <br />
The URL can be used to link to this page
Your browser does not support the video tag.