My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2025-252
CBCC
>
Official Documents
>
2020's
>
2025
>
2025-252
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/20/2025 1:08:51 PM
Creation date
11/13/2025 2:07:12 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Developer's Agreement
Approved Date
11/04/2025
Control Number
2025-252
Agenda Item Number
11.A.1.
Entity Name
Pulte Home Company, LLC
Subject
Development Agreement for Emerson Oaks Subdivision
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
on the Preliminary Opinion of Probable Costs for the Indrio Pointe Bridge, attached hereto as <br />Exhibit "D" and by this reference incorporated herein. This payment shall be made to Indian River <br />County Board of County Commissioners and payment shall be coordinated with the Public Works <br />Director. <br />iv. Sidewalks. The Developer shall provide the following sidewalks as part of <br />the Project: <br />a) External sidewalks. An eight -foot (8) wide sidewalk shall <br />be constructed along the north side of 17th Street Southwest and the west side of 43rd Avenue <br />Southwest, for the projects entire frontage abutting those roads. The final design of these <br />sidewalks will be reviewed via the LDP for each respective project phase and must be completed <br />prior to issuance of a certificate of completion for each respective project phase. (see prelim <br />approval pg. 4. paragraph 12. B.) <br />b) Internal sidewalks. A five-foot (5) wide internal sidewalk <br />system shall be constructed along one side of the Project's internal streets. <br />All sidewalks located within the Project shall be designed and constructed in <br />segments, according to the percentage or amount of the sidewalks that are located within the <br />bounds of each Phase. Each such segment shall be 1.) designed and constructed to County <br />standards (including, without limitation, LDR 913.09(5)(b)2), 2.) subject to receipt of all required <br />governmental approvals, 3.) turned over to and maintained by a homeowner's association (a <br />"HOA"), 4.) included in the LDP for each Phase, 5.) constructed along with the construction of <br />improvements within each Phase, and 6.) completed prior to the issuance of a certificate of <br />completion for each Phase. <br />V. Streetlights. Streetlights to be located within the bounds of each Phase will <br />be 1.) specified in the LDP for each Phase, 2.) constructed along with the improvements within <br />that Phase, 3.) turned over to and maintained by an HOA and 4.) completed prior to issuance of a <br />certificate of completion for such Phase. <br />vi. Common Green Space and/or Recreation Area. The Developer shall <br />provide eight and forty-six one hundredth (8.46) acres, which is eleven percent (11%) of the site <br />as dedicated common green space and/or recreation area (the "Greenspace"). The Greenspace will <br />be composed of a clubhouse/amenity tract, several passive recreation/open space tracts, and the <br />native uplands set-aside tract. County staff has verified that the Greenspace will satisfy the <br />County's green space/recreation area requirements with respect to the Project. The portion of the <br />Greenspace located within the bounds of each Phase will be 1.) reviewed via the LDP for each <br />Phase, 2.) included in the construction of the improvements within that Phase, and 3.) completed <br />prior to issuance of a certificate of completion for such Phase. <br />D. Landscaping. <br />595048 Lv1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.