My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2025-239
CBCC
>
Official Documents
>
2020's
>
2025
>
2025-239
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/14/2025 11:38:59 AM
Creation date
11/14/2025 11:30:28 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
10/21/2025
Control Number
2025-239
Agenda Item Number
9.P.
Entity Name
Ric-Man Construction Florida Inc.
Subject
Contract for Progressive Design-Build Services for Ixora Park Infrastructure Improvements
Project Number
IRCDUS Proj. ID: 41.23.548
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
9.1.6 All subconsultant and subcontractor contracts must be submitted at time of billing. <br />Subconsultant and subcontractor contracts must include a provision providing the Owner the <br />same rights to audit all of Design -Builder's subconsultant and subcontractor contracts entered <br />into by the Design -Builder to effect Project completion. <br />9.1.7 An employee basic services spreadsheet based on the fee and scope proposal in Excel <br />format listing the employee's name, employee's classification and employee's raw rate must be <br />submitted before the Design -Builder's invoice submittal. If there are changes such as new <br />employees, new classification or new raw rate, then an updated basic services spreadsheet in <br />Excel format is required to be submitted. New rate tables must be approved by the Owner. <br />9.1.8 Basic services invoices that are submitted with a Design -Builder's invoice that are older <br />than 90 days before the submission date will not be reimbursed. <br />9.1.9 N/A <br />9. 1.10 Basic services must be organized using standard separators to identify the basic <br />services being billed. <br />9.1.11 All permit requirements and acceptable deliverables are required to be submitted seven <br />days before submission of a final professional service invoice. <br />9.1.12 If deficiencies are found, a standard deficiency e-mail will be sent to the Design -Builder <br />to resolve. Design -Builder will have 24 hours to resolve such deficiency. If the deficiency is not <br />resolved within that time, the Design -Builder's invoice will be returned. <br />9.1.13 Owner has the right to withhold payment for amounts in dispute in any invoice. All <br />undisputed amounts in any invoice shall be paid in accordance with applicable law and this <br />Contract. <br />9.2 COMPENSATION FOR ADDITIONAL SERVICES <br />9.2.1 The compensation for Additional Services under this Contract will be on the basis of the <br />scope of work and in the amount of fees set forth in a written request of the Owner, which will <br />have resulted from negotiation of the scope and the fees prior to such request of the Owner. <br />9.4 INVOICES AND RECORDS <br />9.4.1 Whenever compensation is paid to the Design -Builder on a reimbursable basis, records <br />as to the direct expense must be kept on a generally accepted accounting basis and must be <br />submitted with each invoice to the Owner. In addition, the Design -Builder will submit with each <br />invoice a detailed accounting of the value of Work performed to date by their design <br />professionals and subcontractors. This accounting will include the names and addresses of their <br />design professionals and subcontractors that have participated, a description of the work each <br />named design professional and subcontractor has performed and the value of work performed <br />by each named design professional and subcontractor. <br />9.4.2 If the scope of the Project is changed materially, the amount of compensation may be <br />equitably adjusted, if requested in writing, by either the Owner or the Design -Builder. <br />Ixora Park Infrastructure Improvements 16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.