My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2025-229A
CBCC
>
Official Documents
>
2020's
>
2025
>
2025-229A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/14/2025 12:28:33 PM
Creation date
11/14/2025 12:21:53 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Change Order
Approved Date
10/07/2025
Control Number
2025-229A
Agenda Item Number
16.B.7.
Entity Name
CK Contractors & Development
Subject
Change Order #2 for IRC Landfill Improvements – Automated Scale Lane Project
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
E- 1 <br />Summit Construction of Vero Beach <br />PROPOSAL for WORK CHANGE DIRECTIVE <br />No. 01 <br />PROJECT: IRC Landfill Scale Lanes Date: 7/08/2025 <br />Contractor: CK Contractors & Development Attn: Nicole Mancini <br />Owner: Indian River County Landfill <br />Contractor Proposes the following changes to the project scope: <br />Description: At owners request, add cameras and lift gates, with conduits per Plans <br />dated 7/02/25 (revised) as prepared by Kimley Horn. <br />See scope attached. <br />Total WCD $182,850.00 <br />Estimated Cost of Changes: $182,850.00 <br />Estimated Additional Time <br />Required For Changes: 0 Days <br />SuTmit Construction: Contractor: <br />Lincoln Irons, Presidet /Clt UfontiractoiM&'development <br />Date: Date: <br />
The URL can be used to link to this page
Your browser does not support the video tag.