Laserfiche WebLink
E- 1 <br />Summit Construction of Vero Beach <br />PROPOSAL for WORK CHANGE DIRECTIVE <br />No. 01 <br />PROJECT: IRC Landfill Scale Lanes Date: 7/08/2025 <br />Contractor: CK Contractors & Development Attn: Nicole Mancini <br />Owner: Indian River County Landfill <br />Contractor Proposes the following changes to the project scope: <br />Description: At owners request, add cameras and lift gates, with conduits per Plans <br />dated 7/02/25 (revised) as prepared by Kimley Horn. <br />See scope attached. <br />Total WCD $182,850.00 <br />Estimated Cost of Changes: $182,850.00 <br />Estimated Additional Time <br />Required For Changes: 0 Days <br />SuTmit Construction: Contractor: <br />Lincoln Irons, Presidet /Clt UfontiractoiM&'development <br />Date: Date: <br />