A. The acceptance by the CONTRACTOR of final payment shall be and <br /> shall operate as a release to the OWNER from all claims and all liability <br /> to the CONTRACTOR other than claims in stated amounts as may be <br /> specifically excepted by the CONTRACTOR for all things done or <br /> furnished in connection with the work under this Contract and for every <br /> act and neglect of the OWNER and others relating to or arising out of <br /> the work. Any payment, however, final or otherwise, shall not release <br /> the CONTRACTOR or its sureties from any obligations under the <br /> Contract Documents or the Public Construction Bond. <br /> ARTICLE 7 - INDEMNIFICATION <br /> 7.01 CONTRACTOR shall indemnify OWNER, ENGINEER, and others in <br /> accordance with paragraph 6.20 (Indemnification) of the General Conditions to <br /> the Construction Contract. <br /> ARTICLE 8 -CONTRACTOR'S REPRESENTATIONS <br /> 8.01 In order to induce OWNER to enter into this Agreement CONTRACTOR <br /> makes the following representations: <br /> A. CONTRACTOR has examined and carefully studied the Contract Documents <br /> and the other related data identified in the Bidding Documents. <br /> B. CONTRACTOR has visited the Site and become familiar with and is satisfied as <br /> to the general, local, and Site conditions that may affect cost, progress, and <br /> performance of the Work. <br /> C. CONTRACTOR is familiar with and is satisfied as to all federal, state, and local <br /> Laws and Regulations that may affect cost, progress, and performance of the <br /> Work. <br /> D. CONTRACTOR has carefully studied all: (1) reports of explorations and tests of <br /> subsurface conditions at or contiguous to the Site and all drawings of physical <br /> conditions in or relating to existing surface or subsurface structures at or <br /> contiguous to the Site (except Underground Facilities) which have been <br /> identified in the Supplementary Conditions as provided in paragraph 4.02 of the <br /> General Conditions and (2) reports and drawings of a Hazardous Environmental <br /> Condition, if any, at the Site which have been identified in the Supplementary <br /> Conditions as provided in paragraph 4.06 of the General Conditions. <br /> E. CONTRACTOR has obtained and carefully studied (or assumes responsibility <br /> for having done so)all additional or supplementary examinations, investigations, <br /> explorations, tests, studies, and data concerning conditions (surface, <br /> subsurface, and Underground Facilities) at or contiguous to the Site which may <br /> affect cost, progress, or performance of the Work or which relate to any aspect <br /> of the means, methods,techniques, sequences, and procedures of construction <br /> to be employed by CONTRACTOR, including applying the specific means, <br /> methods, techniques, sequences, and procedures of construction, if any, <br /> expressly required by the Contract Documents to be employed by <br /> CONTRACTOR, and safety precautions and programs incident thereto <br /> F. CONTRACTOR does not consider that any further examinations, investigations, <br /> explorations, tests, studies, or data are necessary for the performance of the <br />