Laserfiche WebLink
SECTION 00520 Agreement <br />THIS AGREEMENT is by and between INDIAN RIVER COUNTY, a Political Subdivision <br />of the State of Florida organized and existing under the Laws of the State of Florida, <br />(hereinafter called OWNER) and Viking Painting, LLC (hereinafter called <br />CONTRACTOR). OWNER and CONTRACTOR, in consideration of the mutual <br />covenants hereinafter set forth, agree as follows: <br />ARTICLE 1 - WORK <br />1.01 CONTRACTOR shall complete all Work as specified or indicated in the Contract <br />Documents. The Work is generally described as follows: <br />The proposed project consists of work necessary to rehabilitate the 400,000 -gallon <br />multi -leg steel elevated potable water storage tank located in Indian River County, <br />Florida, including the coating of new metalwork and hardware, removal of damaged or <br />corroded paint and re -coating and all accessory items to provide a complete and <br />structurally sound system as outlined in these documents. <br />ARTICLE 2 - THE PROJECT <br />2.01 The Project for which the Work under the Contract Documents may be the whole <br />or only a part is generally described as follows: <br />Project Name: Gifford Water Tank Structural Rehabilitation Phase 2 <br />County Project Number: IRC -13.23.538 <br />Bid Number: 2025067 <br />Project Address: 4680 28th Ct, Vero Beach, FL, 32967 <br />ARTICLE 3 - ENGINEER <br />3.01 The Indian River County Public Works Department is hereinafter called the <br />ENGINEER and will act as OWNER's representative, assume all duties and <br />responsibilities, and have the rights and authority assigned to ENGINEER in the <br />Contract Documents in connection with the completion of the Work in <br />accordance with the Contract Documents. <br />ARTICLE 4 - CONTRACT TIMES <br />4.01 Time of the Essence <br />A. All time limits for Milestones, if any, Substantial Completion, and completion and <br />readiness for final payment as stated in the Contract Documents are of the <br />essence of the Contract. <br />4.02 Days to Achieve Substantial Completion, Final Completion and Final Payment <br />A. The Work will be substantially completed on or before the 60th calendar day <br />after the date when the Contract Times commence to run as provided in <br />paragraph 2.03 of the General Conditions, and completed and ready for final <br />payment in accordance with paragraph 14.07 of the General Conditions on or <br />before the 90th calendar day after the date when the Contract Times commence <br />to run. <br />