Laserfiche WebLink
Porte Cochere Budget # 2 10/8/2025 <br />2424 SF <br />Foundations (F3050 x 12) <br />$ <br />16,667 <br />Steel (SC -1 x 8) <br />$ <br />14,000 <br />Beams & Framing (215LF) <br />$ <br />20,800 <br />Trusses & Install (1980 SF) <br />$ <br />27,794 <br />Roofing (1980 SF) <br />$ <br />37,620 <br />Gutters (160 Lf) <br />$ <br />4,800 <br />Stucco (1434 SF) <br />$ <br />11,472 <br />PVC Column Wraps 2 ft x 14ft (12 each) <br />$ <br />38,016 <br />PVC Ceiling with Panel Trims (2424 SF) <br />$ <br />50,962 <br />Rafter Tails (69) <br />$ <br />11,466 <br />Painting (3224 SF) <br />$ <br />3,869 <br />Electrical (Lights 12 each) <br />$ <br />6,750 <br />Pavers at Covered Drive <br />$ <br />5,364 <br />Header Curbs <br />$ <br />3,900 <br />Subtotal <br />$ <br />253,480 <br />Liability Inusrance <br />$ <br />2,408 <br />Payment & Performance Bond (01-820): <br />$ <br />2,166 <br />Builders Risk <br />$ <br />2,184 <br />Subtotal Project Cost <br />$ <br />260,238 <br />OH & P <br />$ <br />13,012 <br />SubTotal <br />$ <br />273,250 <br />5% Contingengy <br />$ <br />13,663 <br />Total Budget <br />$ <br />286,913 <br />