Laserfiche WebLink
CHANGE ORDER NO. 1 <br />DESCRIPTION OF ITEMIZED CHANGES <br />PROJECT NAME: 43rd Avenue Bicycle and Pedestrian Improvements <br />14th Lane and 15th Place Resurfacing <br />PROJECT NO. IRC -1818A BID NO. 2024043 <br />430-175-115 <br />PIPE CULVERT ROUND 15" S/CD POLYPROPYLENE <br />LF <br />1 10 <br />151.31 <br />1,513.10 <br />2,211.00 <br />526-1-101 <br />REMOVE AND REPLACE BRICK PAVERS <br />SF <br />194 <br />11.48 <br />2,227.12 <br />100 000.00 <br />530-3-4 <br />RIPRAP RUBBLE F&I, IrAULVERT INSTALLATION <br />TN <br />2 <br />244.59 <br />489.18 <br />0.16 <br />570-1-1A <br />PERFORMANCE TURF (SOD) (BAHIA) <br />SY <br />131 <br />5.42 <br />710.02 <br />570-1-1 B <br />PERFORMANCE TURF SOD ST. AUGUSTINE <br />SY <br />1 300.00 <br />7.37 <br />2,211.00 <br />999-1 <br />FORCE ACCOUNT <br />LS <br />1 <br />100 000.00 <br />100 000.00 <br />1A <br />ROUNDING ISSUE <br />LS <br />1 <br />0.16 <br />0.16 <br />SUBTOTALS1 I 1 1 4,939.42 1 102,211.16 <br />43rd Avenue Bicycle and Pedestrian Improvements <br />14th Lane and 15th Place Resurfacing TOTAL $ (97,271.74) <br />1 <br />F:\Public Works\ENGINEER ING DIVISION PROJECTS\1818A 14th Ln & 15th PI Resurfacing\1-Admin\Ngenda fte"\Project Cbseout\CO Back up\IRC-1818A_CO1_EXCEL <br />