My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2025-286
CBCC
>
Official Documents
>
2020's
>
2025
>
2025-286
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/19/2025 1:17:56 PM
Creation date
12/19/2025 1:13:06 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
12/09/2025
Control Number
2025-286
Agenda Item Number
9.X.
Entity Name
Kimley-Horn & Associates, Inc.
Subject
Engineering Services Work Order 25 for 43rd Avenue Pedestrian & Bike Improvements
(6th Street – 12th Street)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Work Order No. 25 <br />43rd Avenue Pedestrian & Bicycle <br />Improvement Project PH II <br />EXHIBIT A <br />SCOPE OF WORK <br />The County desires to expand the existing pedestrian and bike lane networks and <br />enhance their interconnectivity between communities. The County desires to design and <br />permit 6 -foot sidewalks and 6 -foot paved buffered bike lanes along both sides of 43rd Avenue <br />between 6th, Street and 12th Street, approximately 4,000 linear feet. This project will connect <br />to and expand the pedestrian and bike lane facilities currently under construction within the <br />43rd Avenue Pedestrian & Bicycle Improvements between 12th Street and 18th Street. In <br />addition to the pedestrian and bike lane improvements, the County desires to include milling <br />and resurfacing plans for 43rd Avenue within the project limits. <br />A. Topographic Design Survey: <br />The Consultant will provide topographic design survey services necessary to support and <br />facilitate contemplated design and permitting activities associated with this project. This task <br />will consist of the preparation of digital base map topographic surveys in accordance with the <br />Standards of Practice, established by the Board of Professional Surveyors and Mappers, Chapter <br />5J-17, Florida Administrative Codes, pursuant to current Section 472.027, Florida Statutes, per <br />5J-17.050 through 5J-17.052. The survey will include: <br />The survey will include: <br />1. Establishment of a project wide Horizontal Control Network within the PROJECT LIMITS. <br />A Design Survey Baseline will be established and monumented. A minimum of three <br />Design Survey Baseline monuments will be installed. <br />2. Establishment of a project wide Vertical Control Network within the PROJECT LIMITS. All <br />elevations will be referenced to NAVD 1988 datum. <br />The limits of the topographic design survey are as follows: <br />43rd Avenue - between 6th Street and 12th Street, approximately 4,000 linear feet. <br />Topographic survey shall extend no less than 15 feet beyond the right-of- <br />way. <br />B. Geotechnical Investigation: <br />The Consultant will retain the services of a Geotechnical sub -consultant to assist in <br />evaluating the existing soil and roadway pavement conditions. The Geotechnical sub - <br />consultant will provide the following Geotechnical Services: <br />Page 2 of 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.