My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2025-291
CBCC
>
Official Documents
>
2020's
>
2025
>
2025-291
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/19/2025 1:41:10 PM
Creation date
12/19/2025 1:39:54 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
12/09/2025
Control Number
2025-291
Agenda Item Number
16.B.2.
Entity Name
Geosyntec Consultants
Subject
Work Order 10 for Annual Compliance Monitoring and Reporting for 2026
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Himanshu H. Mehta, P.E. <br />13 November 2025 <br />Page 8 <br />the C&D debris disposal facility and at seven (7) groundwater monitoring wells (MW -3S, MW - <br />145, MW -44S, MW -44I, MW -535, MW -54S, and MW -541) and four (4) surface water samples <br />(C5 -SWI, SW -MW -145, SW -MW -53S, and SW -MW -54S) for the Class I landfill. <br />The January and July sampling will be performed as part of the semi-annual sampling program <br />under Phase 2 for the C&D debris disposal facility and assumed to take three (3) additional days <br />per event to complete. The April and October data collection and sampling will each take four <br />(4) days to complete. Geosyntec will deliver the samples to Eurofins laboratory for analytical <br />testing under the SWDD's contract (i.e., Eurofins will directly invoice the SWDD for laboratory <br />charges). <br />For the C&D debris disposal facility, the quarterly assessment monitoring samples (including <br />those collected in January and July) will be analyzed for the routine monitoring parameters listed <br />in Paragraph 8 of the WQMP (C&D Permit) plus arsenic and benzene. <br />For the Class I landfill, the quarterly assessment groundwater monitoring samples will be <br />sampled for parameters as required by subparagraph 62-701.510(6)(a)3, F.A.C. The surface <br />water samples will be sampled and screened for field parameters. <br />Geosyntec will assist the SWDD in coordinating the analytical testing activities with Eurofins, <br />notify the FDEP prior to sampling as required by the WQMP, review and evaluate the analytical <br />test results, and prepare a letter report for each quarterly assessment monitoring event. <br />The reports will be submitted in draft forms to the SWDD for review and comment and will be <br />finalized, with the SWDD's comments implemented, for submittal to the FDEP. Any changes to <br />the monitoring and reporting requirements that might be requested by the FDEP based on the <br />results of the quarterly assessment monitoring will be performed under Phase 6 below. <br />Phase 4 — Storage Tank Monitorine Well Sampling and Reporting <br />In accordance with Table 2 of the Order, Geosyntec will assist the SWDD with quarterly <br />monitoring of well associated with the leachate storage tank, analytical testing by Eurofins under <br />direct contract to the SWDD, and preparation of the 2026 Annual Summary Report for submittal <br />to the FDEP. <br />It is assumed that SWDD will perform or coordinate daily visual inspection for leaks, monthly <br />hydrostatic testing and annual interior inspection for the leachate storage tank (as required by the <br />Class I Permit and the Order) and provide documentation to Geosyntec for inclusion in the 2026 <br />Annual Summary Report, as appropriate. <br />NCP2525467/2026 Compliance Monitoring Proposal_l' <br />engineers I scientists I innovators <br />
The URL can be used to link to this page
Your browser does not support the video tag.