Laserfiche WebLink
Mr. Himanshu H. Mehta, P.E. <br />13 November 2025 <br />Page 8 <br />the C&D debris disposal facility and at seven (7) groundwater monitoring wells (MW -3S, MW - <br />145, MW -44S, MW -44I, MW -535, MW -54S, and MW -541) and four (4) surface water samples <br />(C5 -SWI, SW -MW -145, SW -MW -53S, and SW -MW -54S) for the Class I landfill. <br />The January and July sampling will be performed as part of the semi-annual sampling program <br />under Phase 2 for the C&D debris disposal facility and assumed to take three (3) additional days <br />per event to complete. The April and October data collection and sampling will each take four <br />(4) days to complete. Geosyntec will deliver the samples to Eurofins laboratory for analytical <br />testing under the SWDD's contract (i.e., Eurofins will directly invoice the SWDD for laboratory <br />charges). <br />For the C&D debris disposal facility, the quarterly assessment monitoring samples (including <br />those collected in January and July) will be analyzed for the routine monitoring parameters listed <br />in Paragraph 8 of the WQMP (C&D Permit) plus arsenic and benzene. <br />For the Class I landfill, the quarterly assessment groundwater monitoring samples will be <br />sampled for parameters as required by subparagraph 62-701.510(6)(a)3, F.A.C. The surface <br />water samples will be sampled and screened for field parameters. <br />Geosyntec will assist the SWDD in coordinating the analytical testing activities with Eurofins, <br />notify the FDEP prior to sampling as required by the WQMP, review and evaluate the analytical <br />test results, and prepare a letter report for each quarterly assessment monitoring event. <br />The reports will be submitted in draft forms to the SWDD for review and comment and will be <br />finalized, with the SWDD's comments implemented, for submittal to the FDEP. Any changes to <br />the monitoring and reporting requirements that might be requested by the FDEP based on the <br />results of the quarterly assessment monitoring will be performed under Phase 6 below. <br />Phase 4 — Storage Tank Monitorine Well Sampling and Reporting <br />In accordance with Table 2 of the Order, Geosyntec will assist the SWDD with quarterly <br />monitoring of well associated with the leachate storage tank, analytical testing by Eurofins under <br />direct contract to the SWDD, and preparation of the 2026 Annual Summary Report for submittal <br />to the FDEP. <br />It is assumed that SWDD will perform or coordinate daily visual inspection for leaks, monthly <br />hydrostatic testing and annual interior inspection for the leachate storage tank (as required by the <br />Class I Permit and the Order) and provide documentation to Geosyntec for inclusion in the 2026 <br />Annual Summary Report, as appropriate. <br />NCP2525467/2026 Compliance Monitoring Proposal_l' <br />engineers I scientists I innovators <br />