Laserfiche WebLink
h. Minimum right-of-way widths (by road type); <br />Minimum open space per lot and by phase [Note: The minimum open space for the entire project <br />shall meet or exceed the requirements of section 915.18.] <br />Minimum preservation/conservation area per lot. <br />Note: more conceptual plan submittal requirements are listed -out in section 915.24. <br />(2) Notwithstanding other provisions in this chapter (915) and Chapter 971, specific land use criteria listed <br />in Chapter 971 may be waived (modified or not applied) where such criteria would merely apply to the <br />compatibility of uses within the P.D. project area if approved by the county. Where specific land use <br />criteria apply to the relationship of a use(s) within a P.D. project and properties adjacent to the project <br />area, the specific land use criteria shall apply pursuant to the provisions of chapter 971. <br />(3) The conventional standards and criteria found in Chapter 911, Zoning, not covered in subsection <br />915.15(1) shall apply unless otherwise specifically waived or modified by other provisions of this <br />chapter. <br />(Ord. No. 2012-021, § 1, 7-10-12) <br />Section 915.16. Compatibility standards. <br />Compatibility with areas adjacent to P.D. project areas shall be ensured by project compliance with the <br />following requirements. <br />(1) A twenty -five-foot setback from buildings, driveways, roadways, and parking areas to perimeter P.D. <br />project area property lines shall be established and shown on all plans for residential PD projects, with <br />the exception of TND and mixed use projects. <br />(A) The twenty -five-foot setback shall not be required along a P.D. project perimeter where there is <br />an existing or planned commercial or industrial use, mixed use, or TND project on the adjacent <br />property or where the P.D. project perimeter is adjacent to property having a commercial or <br />industrial land use plan designation. In such cases, normal setback, buffer, and landscape <br />standards shall apply. <br />In addition, the twenty -five-foot setback shall not be required along the boundaries of a P.D. <br />where those boundaries are contiguous to lands which are part of the same project. For these <br />purposes, contiguous lands shall be considered part of the same project if the contiguous lands <br />and the land comprising the PD/PRD are under unified control, as provided in section 915.09. <br />(B) Yard encroachments provided in section 911.15 that do not conflict with project buffer <br />requirements may be applied within residential P.D. projects. <br />(C) Where a P.D. residential project abuts another residential project that requires a perimeter <br />buffer, the required buffer areas may be allowed to "overlap" with a single buffer meeting both <br />requirements, if approved by the board of county commissioners. <br />(2) Buffers (A, B, or C) or transition areas (TA) shall be provided in accordance with the following <br />compatibility matrix. These buffer and transition area requirements do not supercede or replace buffer <br />and transition area requirements of other code sections, but may be credited toward meeting buffer <br />and transition area requirements of other code sections. <br />(Supp. No. 151) <br />Page 12 of 29 <br />Created: 2025-06-25 14:39:51 [EST] <br />17 <br />