My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2025-103A
CBCC
>
Official Documents
>
2020's
>
2025
>
2025-103A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/2/2026 12:17:56 PM
Creation date
2/2/2026 11:13:51 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Miscellaneous
Approved Date
05/06/2025
Control Number
2025-103A
Agenda Item Number
9.Q.
Entity Name
State of Florida Department of Transportation (FDOT)
Subject
Parcel 118.3R Right of Way CR510 (Wabasso Rd/85th Street) Certain Lands have been
determined necessary for highway purposes
Document Relationships
2025-103B
(Cover Page)
Path:
\Official Documents\2020's\2025
2025-103C
(Cover Page)
Path:
\Official Documents\2020's\2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BK: 3337 PG: 1276 <br />Summer Lake North <br />Utility Cost Estimate <br />For Bill of Sale and 1 -Year Maintenance Amount <br />UCP #3479 <br />WATER SYSTEM <br />UNIT <br />QUANTITY <br />UNIT PRICE <br />TOTAL <br />6" C-900 <br />LF <br />1208 <br />$ <br />24.00 <br />$ <br />28,992.00 <br />6" MJGV <br />EA <br />3 <br />$ <br />1,370.00 <br />$ <br />4,110.00 <br />6" MJ TEE <br />EA <br />2 <br />$ <br />575.00 <br />$ <br />1,150.00 <br />6" 90 MJ Bends <br />EA <br />2 <br />$ <br />475.00 <br />$ <br />950.00 <br />6"45 MJ Bends <br />EA <br />3 <br />$ <br />475.00 <br />$ <br />1,425.00 <br />6" 22.5 MJ Bends <br />EA <br />2 <br />$ <br />475.00 <br />$ <br />950.00 <br />Fire Hydrants Assembly & GV <br />EA <br />1 <br />$ <br />5,100.00 <br />$ <br />5,100.00 <br />2" Blow Off <br />EA <br />1 <br />$ <br />1,500.00 <br />$ <br />1,500.00 <br />Single Water Service <br />EA <br />11 <br />$ <br />1,375.00 <br />$ <br />15,125.00 <br />Double Water Service <br />EA <br />5 <br />$ <br />1,755.00 <br />$ <br />8,775.00 <br />Laterals - double services <br />EA <br />9 <br />$ <br />Subtotal <br />$ <br />68,077.00 <br />SANITARY SEWER <br />Manholes 0'- 6' <br />EA <br />1 <br />$ <br />3,380.00 <br />$ <br />3,380.00 <br />Manholes 6'- 10' <br />EA <br />2 <br />$ <br />5,425.00 <br />$ <br />10,850.00 <br />Manholes 10' - 12' <br />EA <br />1 <br />$ <br />6,200.00 <br />$ <br />6,200.00 <br />Manholes 14'- 16' <br />EA <br />2 <br />$ <br />7,844.00 <br />$ <br />15,688.00 <br />8" PVC Sewer Main 0'- 6' Cut <br />LF <br />137 <br />$ <br />26.00 <br />$ <br />3,562.00 <br />8" PVC Sewer Main 6'- 8' Cut <br />LF <br />110 <br />$ <br />27.75 <br />$ <br />3,052.50 <br />8" PVC Sewer Main 8' - 10' Cut <br />LF <br />315 <br />$ <br />29.45 <br />$ <br />9,276.75 <br />8" PVC Sewer Main 10' -12' Cu <br />LF <br />397 <br />$ <br />33.00 <br />$ <br />13,101.00 <br />8" PVC Sewer Main 12'- 14'Cu <br />LF <br />164 <br />$ <br />35.00 <br />$ <br />5,740.00 <br />Laterals - single services <br />EA <br />3 <br />$ <br />1,275.00 <br />$ <br />3,825.00 <br />Laterals - double services <br />EA <br />9 <br />$ <br />1,432.00 <br />$ <br />12,888.00 <br />Subtotal <br />$ <br />87,563.25 <br />Maintenance Amount @ 250. 1 $ 38,910.06 <br />� Date: <br />2 2020 <br />sep�1/�;E.O� No. 47048 <br />APPROVED <br />.D.U.S. <br />l i c9/lb-ozo <br />EXHIBIT "A" <br />
The URL can be used to link to this page
Your browser does not support the video tag.