My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2026-015
CBCC
>
Official Documents
>
2020's
>
2026
>
2026-015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/9/2026 2:08:07 PM
Creation date
2/9/2026 2:07:05 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
01/27/2026
Control Number
2026-015
Agenda Item Number
9.F.
Entity Name
State of Florida Department of Transportation (FDOT)
Subject
Utility Work by Highway Contractor Agreement for US-1 Highway from
North of 87th Street to South of Sebastian Blvd, State Road No. 5
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
710-010-22 <br />STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION UTILITIES <br />UTILIES <br />UTILITY WORK BY HIGHWAY CONTRACTOR AGREEMENT OOc-06/19 <br />(AT UTILITY EXPENSE) <br />way. <br />The UAO shall remove the Facilities at the request of the FDOT in the event that the FDOT <br />determines that removal is necessary for FDOT use of the right of way or in the event that the FDOT <br />determines that use of the right of way is needed for other active utilities that cannot be otherwise <br />accommodated in the right of way. Removal shall be at the sole cost and expense of the UAO and <br />without any right of the UAO to object or make any claim of any nature whatsoever with regard <br />thereto. Removal shall be completed within the time specified in the FDOT's notice to remove. In <br />the event that the UAO fails to perform the removal properly within the specified time, the FDOT may <br />proceed to perform the removal at the UAO's expense pursuant to the provisions of Sections <br />337.403 and 337.404, Florida Statutes. <br />Except as otherwise provided in Subparagraph e. above, the UAO agrees that the Facilities shall <br />forever remain the legal and financial responsibility of the UAO. The UAO shall reimburse the FDOT <br />for any and all costs of any nature whatsoever resulting from the presence of the Facilities within the <br />right of way. Said costs shall include, but shall not be limited to, charges or expenses which may <br />result from the future need to remove the Facilities or from the presence of any hazardous substance <br />or material in or discharging from the Facilities. Nothing in this paragraph shall be interpreted to <br />require the UAO to indemnify the FDOT for the FDOT's own negligence; however, it is the intent that <br />all other costs and expenses of any nature be the responsibility of the UAO. <br />6. Default <br />a. In the event that the UAO breaches any provision of this Agreement, then in addition to any other <br />remedies which are otherwise provided for in this Agreement, the FDOT may exercise one or more of <br />the following options, provided that at no time shall the FDOT be entitled to receive double recovery <br />of damages: <br />(1) Terminate this Agreement if the breach is material and has not been cured within sixty (60) <br />days from written notice thereof from FDOT. <br />(2) Pursue a claim for damages suffered by the FDOT. <br />(3) If the Utility Work is reimbursable underthis Agreement, withhold reimbursement payments <br />until the breach is cured. The right to withhold shall be limited to actual claim payments <br />made by FDOT to third parties. <br />(4) If the Utility Work is reimbursable under this Agreement, offset any damages suffered by the <br />FDOT or the public against payments due under this Agreement for the same Project. The <br />right to offset shall be limited to actual claim payments made by FDOT to third parties. <br />(5) Suspend the issuance of further permits to the UAO for the placement of Facilities on FDOT <br />property if the breach is material and has not been cured within sixty (60) days from written <br />notice thereof from FDOT. <br />(6) Pursue any other remedies legally available. <br />(7) Perform any work with its own forces or through contractors and seek repayment for the cost <br />thereof under Section 337.403(3), Florida Statutes. <br />b. In the event that the FDOT breaches any provision of this Agreement, then in addition to any other <br />remedies which are otherwise provided for in the Agreement, the UAO may exercise one or more of <br />the following options: <br />(1) Terminate this Agreement if the breach is material and has not been cured within sixty (60) <br />days from written notice thereof from the UAO. <br />Page 6 of 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.