My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2026-026
CBCC
>
Official Documents
>
2020's
>
2026
>
2026-026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/18/2026 2:31:13 PM
Creation date
2/18/2026 2:25:06 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
02/10/2026
Control Number
2026-026
Agenda Item Number
9.Q.
Entity Name
Kimley-Horn and Associates, Inc.
Subject
Work Oder No 27 for 37th Street and Indian River Blvd Intersection Improvements
Project Number
IRC-1910
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT A <br />SCOPE OF WORK <br />The County desires to reconstruct the 37th Street and Indian River Boulevard intersection to <br />remove the acute angle intersection geometry to improve driver sightlines and to provide dual <br />eastbound right turn and dual northbound left turn auxiliary lanes. <br />To assist the County in implementing this project the Consultant will assist the County in making <br />application to extend existing jurisdictional permits, review existing franchise utility infrastructure to <br />identify existing facilities that will need to be relocated to accommodate proposed improvements, <br />develop a traffic control plan to aid in minimizing intersection operational disruptions and provide <br />post design services to support the County during construction. <br />A. Jurisdictional Permits: <br />St. Johns River Water Management District (SJRWMD) issued an individual environmental <br />resource permit in September 2021 addressing the work described above. The Consultant will <br />make application to SJRWMD to request a permit extension, as this work is not expected to begin <br />until 2026. <br />B. Franchise Utility Coordination: <br />The Consultant will contact all known utility companies having installations in the immediate <br />vicinity of the proposed work and consider relocation of utilities, if necessary. The Consultant will <br />provide the COUNTY with necessary information relative to required utility adjustments, <br />relocations and installations and will show all known existing utilities on the final design plans. <br />Design modifications to existing utility lines, if necessary, may be negotiated by a separate <br />agreement. <br />C. Traffic Control Plan: <br />The CONSULTANT shall develop a Traffic Control Phasing Plan to move vehicular and pedestrian <br />traffic during all phases of construction. The design shall include construction phasing of roadway <br />ingress and egress to existing property owners and businesses, routing, signing and pavement <br />markings, and detour quantity tabulations. <br />The CONSULTANT shall evaluate and address drainage to adequately drain the road during all <br />construction phases. The Traffic Control Plan shall be prepared by a certified designer who has <br />completed training as required by the Florida Department of Transportation (FDOT). <br />D. Post Design Services: <br />The Consultant will provide professional construction phase assistance as specifically stated <br />below: <br />1. Pre -Bid Meeting. The Consultant will attend the pre-bid meeting to assist the COUNTY in <br />describing the scope of work contained with the construction documents. The Consultant <br />shall provide oral and/or written clarifications to questions presented relative to the <br />scope of work identified within the construction documents. <br />
The URL can be used to link to this page
Your browser does not support the video tag.