Laserfiche WebLink
ALTERNATIVES AND ANALYSIS: <br />The Board has given prior direction to staff to work with the City <br />of Vero Beach in this CAD system project in every way possible. <br />That has been the approach used and representatives from the City <br />have been present when vendors gave presentations to the County and <br />vice versa. <br />Staff is making every effort by taking the recommended approach to <br />protect the County from expending funds unnecessarily. Given <br />information received from the City of Clearwater, Barry Strock was <br />instrumental in negotiating a contract for them which resulted not <br />only in savings up front, but free hardware for several years if <br />Logistic Systems should change the platform used in the CAD system. <br />That aspect of the contract alone could result in a savings of many <br />thousands of dollars to the City of Clearwater. It is—these kinds <br />of issues that have long-term ramifications which demonstrates the <br />need for a person knowledgeable in systems contracting to negotiate <br />the contract on the County's behalf. It is estimated that it will <br />take approximately four weeks for the Consultant to negotiate a <br />contract with Logistics, Inc. <br />Staff from Emergency Services and the Sheriff's Office traveled to <br />the City of Clearwater on December 6, 1996, to review the work of <br />Logistic Systems on site as well as the CAD hardware and software <br />just before it was cut over and became active on December 8, 1996. <br />Staff is even more convinced now that Logistics is the leading CAD <br />technology vendor at this time and it was learned that the cut over <br />on Sunday occurred exceptionally well and the new CAD system <br />hardware and software are now functioning above all expectations of <br />the Clearwater staff. It should be noted that staff from the City <br />of Vero Beach had made a prior visit to the City of Clearwater for <br />the purpose of reviewing the CAD project and the facility. <br />RECOMMENDATION: <br />Staff recommends the Board take the following action: <br />1. Authorize negotiations with Logistic Systems, Inc, <br />pursuant to CCNA; <br />2. Approve the Systems Consulting Contract with Barry Strock <br />Consulting, Inc., estimated at $10,000, or less, which <br />includes travel and other costs incurred in carrying out <br />the duties of the contract, with funding from the <br />contingency fund of the 9-1-1 Surcharge budget, to <br />negotiate a contract with Logistic Systems, Inc., for <br />presentation to the Board of County Commissioners for <br />consideration which will include CAD system cost and <br />staff recommended source of funding; and, <br />3. Authorize staff to work with the staff of the City of <br />Vero Beach to achieve a common CAD system and geofile on <br />a cost sharing basis, to the maximum extent possible, <br />given the needs and unique features each jurisdiction <br />requires. <br />ON MOTION by Commissioner Eggert, SECONDED by <br />Commissioner Ginn, the Board unanimously authorized <br />negotiations with Logistic Systems, Inc. pursuant to <br />CCNA; approved the Systems Consulting Contract with <br />Barry Strock Consulting, Inc. with the conditions <br />recommended by staff; and authorized staff to work <br />with the staff of the City of Vero Beach to achieve <br />a common CAD system and geofile on a cost-sharing <br />basis, as recommended by staff. <br />CONTRACT IS ON FILE IN THE OFFICE <br />OF THE CLERK TO THE BOARD <br />DECEMBER 17, 1996 104 <br />