My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1/28/1997
CBCC
>
Meetings
>
1990's
>
1997
>
1/28/1997
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 12:10:02 PM
Creation date
6/17/2015 9:23:44 AM
Metadata
Fields
Template:
Meetings
Meeting Type
Special Call Meeting
Document Type
Minutes
Meeting Date
01/28/1997
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
65
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
December 19•, 1995. The estimated preliminary assessment was <br />$336,915.26, with an estimated assessment cost of $0.0676229 per <br />square foot. The total final project cost is $427,590.91, less <br />$135,950.00 (a non -assessed transmission main cost), which equates <br />to a final assessment cost of $291,640.91 and a final cost of <br />$0.058612 (rounded) per square foot of property assessed. (See <br />attached.) The final assessment is $0.0090109 (rounded) per square <br />foot less than the preliminary assessment. <br />RECOMMENDATION <br />The staff of the Department of Utility Services recommends that the <br />Board of County Commissioners approve the adoption of Resolution <br />IV, which is attached, and authorize the chairman to execute same. <br />ON MOTION by Commissioner Adams, SECONDED by <br />Commissioner Ginn, the Board unanimously adopted <br />Resolution 97-3, certifying "As -Built" costs for <br />installation of water service to 45th Street. <br />ASSESSMENT ROLL IS ON FILE IN THE OFFICE OF THE CLERK TO THE BOARD <br />49 <br />JANUARY 28, 1997 BOOK 10 0 PnE41`4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.