Laserfiche WebLink
Commissioner Ginn advised that she had requested that this <br />item be put back on the agenda. <br />Public Works Director Jim Davis advised that the Board had <br />approved emergency permits for the properties at the March 4, 1997 <br />meeting. He referred to a sketch on Page 71 showing the location <br />of the seawall (dark solid line 15 feet seaward of the structures) <br />that the Board approved. He explained that Coastal Engineer Jeff <br />Tabar had configured a more gentle alignment as shown by the dashed <br />line (marked "change"). However, Mr. Tabar had subsequently met <br />with the property owners and they wished to have the seawall built <br />more seaward, along the top of the bluff line. <br />393.72 <br />871.80 <br />1,209,297.90 I <br />707,701.85 <br />March 25, 1997 <br />I I� <br />II 10' RETURN/ <br />BOOK J U 0 FAG// , 3 <br />