Laserfiche WebLink
M -L., FAUE5621. <br />�xxxxx,xx•x.***•mx•X*x•,�x,�xx,� xxxx <br />PARCEL 4 26 32 39 00009 0000 00007.0 SOFT. 20909 ASSESSMENT 3,684.7: <br />OWNER KNIGHT,C REED (TR) <br />5740 13TH ST SW 4036 US HIGHWAY i <br />VERO PEACH FL 32968 <br />LEGAL JACKSON BROTHERS S/D <br />LOTS 7, 8, 9, 10, Si, 12 & 13PBI 2-71 <br />tt xtiex x x xet aeoex wex+ex atik �e tt x,rx x arx x »xic aaexx eeirx MIX x•+exxx w tt x x x x eaxx xxireexarxx 9earrex se x x xx x xx x sex <br />PARCEL 0 26 32 39 00009 0000 00016.0 SOFT. 16268 ASSESSMENT 2,866.Be <br />OWNER KNIGHT,C REED <br />5740 13TH ST SW > 4005 19TH CT <br />VERO REACH FL 32968 <br />LEGAL JACKSON BROTHERS SUB PBI 2-71 LOTS 16, t7 & 18, LESS HWY R/ <br />W AS IN R PK 95 FG 246 & INC LOTS 19, 20,-21, 22, 23 6 24 <br />xxaoxxxxieoc�e,exx•�r+we�eac•�c,En�i�i��rr,�•xaeai-x•�e%�eie,e+eae+exuxaix•�r•ie�x�xx-�e�rxeraox,e•iex•+rx•�r«xx+ewxyeu •x•m•��x xxx••�ar•�ie <br />TOTAL SO FEET IS 1267116 TOTAL ASSESSMENT IS r�..3,299.89 <br />11.1.3. SOUTH COUNTY REGIONAL WASTEWATER TREATMENT <br />FACILITY - 2.0 MGD- EXPANSION CONSTRUCTION - BID #4039 - <br />0 M 1 N O I N" <br />The Board reviewed a Memorandum of May 12, 1997: <br />DATE: MAY 12, 1997 <br />TO: JAMES E. CHANDLER <br />COUNTY ADMINISTRATOR . <br />FROM: TERRANCE G. PINTO <br />DIRECTOR OF UTILI SERVICES <br />SONNY DEAN <br />DIRECTOR OF GENERAL SERVICES <br />PREPARED AND <br />STAFF BY: ROBERT O. WISEMEN, P.E. <br />ENVIRONMENTAL ENGINE R <br />SUBJECT: SOUTH COUNTY REGIONAL WASTEWATER <br />TREATMENT FACILITY <br />2.0 MGD EXPANSION CONSTRUCTION <br />INDIAN RIVER COUNTY BID NO. 4039 - BID AWARD <br />INDIAN RIVER COUNTY PROJECT NO. US -90 -20 -DC. <br />On September 20, 1994, the Board of County Commissioners approved and authorized Camp <br />Dresser & McKee, Inc., engineer, to design, permit, and advertise for bid, etc. The project was <br />advertised, with all permits being acquired except for Environmental Resource Permit which will be <br />issued shortly. Bids were received from 5 contractors on April 2, 1997. <br />ANALYSIS <br />The Department of Utility Services Staff received bids that range from $8,347,000.00 to <br />$8,754,000.00. The lowest bid of $8,347,000.00 that was received from Wharton -Smith, Inc is <br />11.3% above the engineer's estimated cost (see attached tabulation) of $7,500,000.00. The County <br />and the engineer have investigated and spoken with the City of Orlando and Daytona Beach. Their <br />Wastewater Treatment Plants costs were 15-25% higher than estimated in the past two (2) years. <br />This is the result of a high demand for Wastewater Treatment Plant contractors. <br />The base bid includes construction of the plant expansion to 2.0 MGD, removal and replacement of <br />headworks screen, installation of a telemetry system, allowances for independent testing laboratory <br />services, roof replacement, renovating of the existing generator room into instrumentation and control <br />room and the operation building, allowance for electrical wire and performance/payment bonds. <br />MAY 20, 1997 <br />GV <br />