M -L., FAUE5621.
<br />�xxxxx,xx•x.***•mx•X*x•,�x,�xx,� xxxx
<br />PARCEL 4 26 32 39 00009 0000 00007.0 SOFT. 20909 ASSESSMENT 3,684.7:
<br />OWNER KNIGHT,C REED (TR)
<br />5740 13TH ST SW 4036 US HIGHWAY i
<br />VERO PEACH FL 32968
<br />LEGAL JACKSON BROTHERS S/D
<br />LOTS 7, 8, 9, 10, Si, 12 & 13PBI 2-71
<br />tt xtiex x x xet aeoex wex+ex atik �e tt x,rx x arx x »xic aaexx eeirx MIX x•+exxx w tt x x x x eaxx xxireexarxx 9earrex se x x xx x xx x sex
<br />PARCEL 0 26 32 39 00009 0000 00016.0 SOFT. 16268 ASSESSMENT 2,866.Be
<br />OWNER KNIGHT,C REED
<br />5740 13TH ST SW > 4005 19TH CT
<br />VERO REACH FL 32968
<br />LEGAL JACKSON BROTHERS SUB PBI 2-71 LOTS 16, t7 & 18, LESS HWY R/
<br />W AS IN R PK 95 FG 246 & INC LOTS 19, 20,-21, 22, 23 6 24
<br />xxaoxxxxieoc�e,exx•�r+we�eac•�c,En�i�i��rr,�•xaeai-x•�e%�eie,e+eae+exuxaix•�r•ie�x�xx-�e�rxeraox,e•iex•+rx•�r«xx+ewxyeu •x•m•��x xxx••�ar•�ie
<br />TOTAL SO FEET IS 1267116 TOTAL ASSESSMENT IS r�..3,299.89
<br />11.1.3. SOUTH COUNTY REGIONAL WASTEWATER TREATMENT
<br />FACILITY - 2.0 MGD- EXPANSION CONSTRUCTION - BID #4039 -
<br />0 M 1 N O I N"
<br />The Board reviewed a Memorandum of May 12, 1997:
<br />DATE: MAY 12, 1997
<br />TO: JAMES E. CHANDLER
<br />COUNTY ADMINISTRATOR .
<br />FROM: TERRANCE G. PINTO
<br />DIRECTOR OF UTILI SERVICES
<br />SONNY DEAN
<br />DIRECTOR OF GENERAL SERVICES
<br />PREPARED AND
<br />STAFF BY: ROBERT O. WISEMEN, P.E.
<br />ENVIRONMENTAL ENGINE R
<br />SUBJECT: SOUTH COUNTY REGIONAL WASTEWATER
<br />TREATMENT FACILITY
<br />2.0 MGD EXPANSION CONSTRUCTION
<br />INDIAN RIVER COUNTY BID NO. 4039 - BID AWARD
<br />INDIAN RIVER COUNTY PROJECT NO. US -90 -20 -DC.
<br />On September 20, 1994, the Board of County Commissioners approved and authorized Camp
<br />Dresser & McKee, Inc., engineer, to design, permit, and advertise for bid, etc. The project was
<br />advertised, with all permits being acquired except for Environmental Resource Permit which will be
<br />issued shortly. Bids were received from 5 contractors on April 2, 1997.
<br />ANALYSIS
<br />The Department of Utility Services Staff received bids that range from $8,347,000.00 to
<br />$8,754,000.00. The lowest bid of $8,347,000.00 that was received from Wharton -Smith, Inc is
<br />11.3% above the engineer's estimated cost (see attached tabulation) of $7,500,000.00. The County
<br />and the engineer have investigated and spoken with the City of Orlando and Daytona Beach. Their
<br />Wastewater Treatment Plants costs were 15-25% higher than estimated in the past two (2) years.
<br />This is the result of a high demand for Wastewater Treatment Plant contractors.
<br />The base bid includes construction of the plant expansion to 2.0 MGD, removal and replacement of
<br />headworks screen, installation of a telemetry system, allowances for independent testing laboratory
<br />services, roof replacement, renovating of the existing generator room into instrumentation and control
<br />room and the operation building, allowance for electrical wire and performance/payment bonds.
<br />MAY 20, 1997