900K "10 1 PACE 678 <br />3. Inspection services range between 2.5%-8% of the estimated <br />cost. At 5%, the fee would be $110,000.00 which at part- <br />time inspection would be $55,000.00 verses $52,154.00. <br />Farmers Home Cost Comparison Curves <br />The most recently available curve is 1981 and is for new <br />construction projects. The fee at 9.8%, if checked based on 1981 <br />dollars, is approximately 1.2 million and the fee would be 10.6%. <br />Our current negotiated fee is 10.46%. <br />Note: All -of these methods are still viable guidelines for linear <br />projects, (i.e. water line, wastewater force main, etc.) <br />However, these are less applicable to retrofit projects such as <br />this one. If these methods were to be used, the fees indicated <br />by them verses the actual project fees would typically be less <br />than required, due to the retrofit nature of this project. <br />Summary - Engineering Fee <br />As can be seen from the above analysis, the negotiated fees <br />associated with this project are less than projected by any of <br />the comparison options. The Utilities staff is very confident in <br />the viability of the proposed fees and feels the County is <br />getting an extremely fair fee for services as outlined. (See <br />attached cost estimate.) <br />List and Description of Attachment and Prior Project Leading up <br />to this Project. <br />1. Jungle Trail Water Main - August 1995 <br />BCC approval -of the construction of the repump station feed <br />line on Jungle Trail from CR 510 to the R.O. Plant. <br />2. North Beach SiW y Water Main-Segtemter 1995 <br />BCC approval of the design of the main feed line from the <br />mainland to Jungle Trail. <br />—NorthBeach Supply Water Main August 1996 <br />BCC approval of construction of the main feed line from the <br />mainland to Jungle Trail. <br />4. BCC approval of the engineering selection for this project <br />and authorization to proceed with negotiations, February <br />1997. <br />5. Relative Master Plan information excerpts. <br />6. Various Brown and Caldwell reports on North Beach and <br />North Beach conversion. <br />7. Excerpt from Manual No. 45 ASCE. <br />NORTH BEACH WW CONVERSION <br />PRIUM WARY CONSTRUCTION COST ESTMATE <br />1. <br />Mobilization/Demobilizatton <br />$ 30,000 <br />2. <br />Storage Tank Foundation <br />50,000 <br />3. <br />Storage Tank <br />325,000 <br />4. <br />FAgh Service pompe (installation included) <br />425,000 <br />5.gectical <br />650,000 <br />6. <br />130,000 <br />7. <br />Yard Piping — - <br />75,000 <br />8. <br />Demolition (tank removal, 811 trenches, etc.) <br />75,000 <br />9. <br />motion/Sodium Hypochlorite <br />45,000 <br />10. <br />Stormwater <br />30,000 <br />11. <br />Paving <br />30,000 <br />12' <br />Landscaping <br />10,000 <br />13. <br />Miscellaneous Work - <br />4p-000 <br />Subtotal <br />$1,915,000 <br />Contingency (150%) <br />287 250 <br />Total <br />n= <br />M <br />JUNE 39 1997 <br />