Laserfiche WebLink
BOOK <br />ON MOTION by Commissioner Adams, SECONDED by <br />Commissioner Macht, the Board unanimously appointed Carrol <br />Frischkorn to the Primary Care/Public Health Committee as a <br />replacement for Gerry Koziel, as recommended by staff. <br />0 PACE386 <br />7-F. WEST WABASSO PARK IMPROVEMENTS — CHANGE ORDER #2 — CHILBERG <br />CONSTRUCTION CO. <br />The Board reviewed a Memorandum of August 14, 1997: <br />TO: <br />James E. Chandler, <br />County Administrator <br />THROUGH: <br />James W. Davis. P.E.. <br />CONSENT AGENDA <br />Public Works Director <br />FROM: <br />Sean McGuire. Project Engineer <br />SUBJECT. <br />West Wabasso Park Improvements - Change Order No. 2 <br />DATE: <br />August 14. 1997 <br />Change Order No. 2 to the West Wabasso Park Improvements contract (current <br />contract is $257. 470.04) is proposed to increase the project cost to $258.713.53. <br />Credits are for the deletion of the concrete block dugouts ($6.456.30) and for <br />substituting schedule 40 pipe in place of the contract specified schedule 80 pipe in <br />the backstop fence ($1.220.09). The County will construct wood frame dugouts for <br />substantially lower cost. which will also allow more ventilation. and will present less <br />of a maintenance hazzard. Schedule 40 pipe is the common standard for fence posts <br />and will not result in any appreciable change in the strength nor the service life of the <br />fence. <br />Extras are for the addition of a 1,200 gallon septic tank ($2.057.98) and the inclusion <br />of epoxy flooring and wall paint in the bathrooms at both this site and the new Gifford <br />Park balMeld ($1.861.90). The septic tank is required by the State Department of <br />Health to service the new concession stand and bathrooms. The existing on-site <br />selvage disposal system will be properly abandoned. The bathrooms must have "non- <br />absorbent" walls and floors. but provisions for such were not made in the original <br />contract documents. We have received a generously discounted price (64% off) to <br />have the bathroom floors at the Gifford Park ballfield done by the out -of -county <br />installer at the same time as they do the West Wabasso Park ballfield. <br />Also included is the return of a previous credit for clearing. grubbing and'stripping <br />($5.000.00) that was mistakenly offered by the contractor. The contract stipulates <br />that the County will do this work. <br />RECOMMENDATIONS AND FUNDING <br />Staff recommends approval of Change Order No. 2 increasing the contract price to <br />$258.713.53. Funding to be from account # 315-210-572-068.04. <br />AUGUST 26, 1997 <br />