Laserfiche WebLink
MOBILIZATION <br />1 L S <br />VIDEO RECORD <br />1 L S <br />6"PVC WM <br />1305LF <br />4"PVC WM <br />440LF <br />FHA <br />3 UNITS <br />6"G V <br />1 UNIT <br />6 " FITTINGS <br />1 TON <br />SHORT DOUBLE <br />2 UNIT <br />SHORT SINGLE <br />15 UNITS <br />LONG DOUBLE <br />2 UNITS <br />LONG SINGLE <br />7 UNITS <br />BORE DRIVEWAYS 260 L F <br />2'B. O. <br />2 UNITS <br />SODDING <br />1780 L F <br />AS - BUILT <br />1 L S <br />JUMPER <br />1 L S <br />KINGSWAY SUBDIVISION WATER SERVICE <br />ESTIMATED PROJECT COST <br />3,000.00 <br />$3,000.00 <br />800.00 <br />$800.00 <br />9.00 <br />$11,745.00 <br />7,00 <br />$3,080.00 <br />1,800.00 <br />$5,400.00 <br />600.00 <br />$600.00 <br />2,500.00 <br />$2,500.00 <br />325.00 <br />$650.00 <br />300.00 <br />$4,500.00 <br />400.00 <br />$800.00 <br />350.00 <br />$2,450.00 <br />20.00 <br />$5,200.00 <br />150.00 <br />$300.00 <br />2.50 <br />$4,450.00 <br />3,000.00 <br />$3,000.00 <br />800.00 <br />$800.00 <br />CONSTRUCTION CONTINGENCY 10 % <br />PERMIT FEE <br />ENGINEERING ✓3< CONSTRUCTION ADMINISTRATION <br />ESTIMATED ASSESSMENT ADMINISTRATIVE EXPENSES <br />TOTAL ESTIMATED PROJECT COST <br />SQUARE FOOTAGE TO BE ASSESSED <br />$49,275.00 <br />$55000 00 <br />$54,275.00 <br />$500.00 <br />$5,000.00 <br />$62,975.00 <br />660,735.00 <br />bcI.`V I f, �A,6E 7,16 <br />ESTIMATED COST PER SQUARE FOOT $0.09531052540 �V <br />9-17-97 <br />J. D. C. <br />KNGSWAY5.WK4 <br />OCTOBER 7, 1997 <br />��v I <br />i1191 <br />