Laserfiche WebLink
County Administrator Chandler agreed that could be done immediately as long as <br />everyone recognizes it is not a permanent solution. The overall project could then be <br />accelerated. <br />Mr. Mensing and Mr. Kirrie suggested installation of larger culverts, and Director <br />Davis stated that culverts can only be installed to a certain depth because of the depth of the <br />road and the cover between the culvert and the road. <br />The Chairman asked if anyone else wished to be heard in this matter. There being <br />none, she closed the public discussion. <br />ON MOTION by Commissioner Macht, <br />SECONDED by Commissioner Ginn, the Board <br />unanimously directed staff to immediately begin the <br />construction of the swales on the unopened rights-of- <br />way and to expedite the issuance of the RFP for the <br />consultant and the permitting required for the <br />permanent solution to the problem. <br />9.C. PUBLIC NOTICE ITEMS <br />9. C.1. - APPLICATION WITH US DEPARTMENT OF <br />TRANSPORTATION FEDERAL TRANSITADMINISTRA TION - <br />SECTION 9 CAPITAL AND OPERA TIONS GRANT - PUBLIC <br />HEARING FOR DECEMBER 2.1997• <br />9. C.2. - REZONING APPROXIMATEL Y 4.6 ACRES ON CL TO PD - <br />KARL, KEITHAND NORMANHEDIN- PROPERTY ONNORTHSIDE <br />OFSR-60 IMMEDIA TEL YEAST OFNEW CITRUS RIDGE POST <br />OFFICE - PUBLIC HEARING FOR DECEMBER 9,199 7: <br />NOVEMBER 25, 1997 -21- BOOK FA�,E -' - <br />