My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1/13/1998
CBCC
>
Meetings
>
1990's
>
1998
>
1/13/1998
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 12:10:55 PM
Creation date
6/17/2015 10:32:09 AM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
01/13/1998
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
69
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
- Solid Waste <br />Solid waste service includes pick-up by private operators and disposal at the county landfill. The <br />county's adopted level of service standard for landfill capacity is 2.37 cubic yards/person/ year. With <br />the county's average of approximately 2.3 persons/unit. a 290 unit residential development would <br />be anticipated to house approximately 667 people (2.3 X 290). For the subject request to meet the <br />county's adopted level of service standard of 2.37 cubic yards/person/year, the landfill must have <br />enough capacity to accommodate approximately 1.581 (667 X 2.37) cubic yards/year. <br />A review of the solid waste capacity for the active segment of the county landfill indicates the <br />availability of more than 840.000 cubic yards. The active segment of the landfill has a 2 year <br />capacity, and the landfill has expansion capacity beyond 2010. Based on the analysis, staff <br />determined that the county landfill can accommodate the additional solid waste generated by the site <br />wider the proposed zoning district. <br />- Drainage <br />All developments are reviewed for compliance with county stormwater regulations which require <br />on-site retention, preservation of floodplain storage and minimum finished floor elevations. In <br />addition, development proposals must meet the discharge requirements of the county Stormwater <br />Management Ordinance. Any development on the subject property will be prohibited from <br />discharging any runoff in excess of the pre -development rate. <br />In this case, the minimum floor elevation level of service standard applies, since the property lies <br />within a floodplain. Consistent with Drainage Policy 1.2. "all new buildings shall have the lowest <br />habitable floor elevation no lower than the elevation of the 100 -year flood elevation as shown on the <br />Federal Emergency Management Agency's Flood Insurance Rate Map, or as defined in a more <br />detailed study report." Additionally, section 930.07(2) of the county's LDRs requires that all <br />residential development shall have the lowest floor (including basement) elevated to six inches or <br />more above the base flood level. Since the subject property lies within Flood Zone AE -7, which is <br />a special flood hazard area located within the 100 -year floodplain. any development on this property <br />must have a minimum finished floor elevation of no less than 7.5 feet above mean sea level. <br />Besides the minimum elevation requirement, on-site retention and discharge standards also apply <br />to this request. With the most intense use of this site, the maximum area of impervious surface under <br />the proposed zoning classification will be approximately 1,106.860 square feet, or 25.41 acres. The <br />estimated runoff volume, based on that amount of impervious surface and the 25 vear24 hour design <br />storm, will be approximately 1,223,049 cubic feet. In order to maintain the county's adopted level <br />of service, the applicant will be required to retain approximately 262,566 cubic feet of runoff on-site. <br />With the soil characteristics of the subject property, it is estimated that the pre -development runoff <br />rate is 58.8 cubic feet/second. <br />Based upon staffs analysis, the drainage level of service standards will be met by limiting off-site <br />discharge to its pre -development rate of 58.8 cubic feettsecond. requiring retention of 262.566 cubic <br />feet of runoff for the most intense use of the property, and requiring that all finished floor elevations <br />exceed 7.5 feet above mean sea level. <br />As with all development, a more detailed review will be conducted during the development approval <br />process. <br />- Recreation <br />A review of county recreation facilities and the projected demand that would result from the most <br />intense development that could occur on the property under the proposed zoning classification <br />indicates that the adopted levels of service would be maintained. The table below illustrates the <br />additional park demand associated with the proposed development of the property and the existing <br />surplus acreage by park type. <br />Park Information <br />Park Type <br />LOS (Acres per 1,000 <br />Population) <br />Project Demand (Acres) Surplus Acreage <br />Urban District <br />5.0 <br />2.90 159.54 <br />Community (north) <br />3.0 <br />1.74 13.57 <br />Beach <br />1.5 <br />0.87 58.26 <br />River <br />1.5 <br />0.87 19 26 <br />Based on the analysis conducted. staff has determined that all concurrency -mandated facilities. <br />including drainage, roads, solid waste. recreation, water, and wastewater, have adequate capacity to <br />accommodate the most intense use of the subject property under the proposed zoning. Therefore. <br />the concurrency test has been satisfied for the subject request. <br />Consistency with Co=rehensive Plan <br />Rezoning requests are reviewed for consistency with all policies of the comprehensive plan. <br />Rezoning requests must also be consistent with the overall designation of land uses as depicted on <br />the Future Land Use Map, which includes agricultural, residential. recreational. conservation, and <br />commercial and industrial land uses and their densities. Commercial and industrial land uses are <br />located in nodes throughout the unincorporated areas of Indian River County. <br />JANUARY 13, 1998 <br />-21- BOOK 104 FACE 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.