My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1/13/1998
CBCC
>
Meetings
>
1990's
>
1998
>
1/13/1998
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 12:10:55 PM
Creation date
6/17/2015 10:32:09 AM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
01/13/1998
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
69
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r- <br />6m 104 PACE 1031 <br />Commissioner Ginn questioned whether any consideration had been given to <br />including Indian River County in the study, and Ms. Kline responded that the Health <br />Department did not feel it was necessary given the preliminary reports. <br />Commissioner Ginn asked Ms. Kline to keep a close eye on the progress and report <br />to the Board. If there should be a need at a later time, then the County could ask to be <br />included in the study. <br />No action taken. <br />11.A.1. HORIZON OUTLET CENTER - REQUEST FOR <br />APPROVAL OF CONCEPTUAL MASTER LANDSCAPE <br />PLAN FOR I-95/SR-60 INTERCHANGE AND <br />AUTHORIZATION TO PREPARE FLORIDA <br />DEPARTMENT OF TRANSPORTATION HIGHWAY <br />BEAUTIFICATION GRANT APPLICATION <br />The Board reviewed a Memorandum of January 7, 1998: <br />TO: James E. Chandler <br />County Administrator <br />MDN HEAD CONCURRENCE: <br />1Cobert M Ceating, AI <br />Community Develo Directo <br />FROM: Stan Boli* AICP ` <br />Planning Director <br />DATE: January 7, 1998 <br />SUBJECT: Request for Approval of a Conceptual Master Landscape Plan for the I-95/SR 60 <br />Interchange and Authorization to Prepare an FDOT Highway Beautification Grant <br />Application <br />It is requested that the data herein presented be given formal consideration by the Board of County <br />Commissioners at its regular meeting of January 13, 1998. <br />BACKGROUND: <br />In the fall of 1996, staff began discussing and reviewing draft sketches of plans by The Horizon <br />Group, Inc. (owners/operators of the Horizon Outlet Center) to trim and landscape the I-95/SR 60 <br />interchange area, including a segment of I-95 1/h mile north and south of SR 60 (see attachment #1). <br />Horizon gave two principal reasons for its request. First, Horizon wanted to trim and maintain <br />adsting vegetation and beautify a "window" to its project located on the west side of I-95 south of <br />SR 60. Second, Horizon wanted to beautify the interchange area in general to enhance the primary <br />"entrance area" to its project. As with any proposal for special landscaping in the right-of-way, <br />FDOT will allow such landscaping only if the county agrees to assume maintenance responsibilities <br />of all specially landscaped areas. <br />At the end of 1996, staff provided comments and indicated to Horizon that once detailed conceptual <br />plans were submitted, reviewed, and revised to respond to staff comments, staff would bring the <br />proposal to the Board for the Board's consideration of a master conceptual interchange landscape <br />plan and corresponding maintenance responsibilities. Subsequently, some limited clearing and <br />trimming within the I-95 median and interchange areas were authorized by FDOT and performed by <br />the applicant In addition, FDOT installed a standard pattern of Washingtonian palms and Seagrape <br />planings within the I-95 medians immediately north and south of SR 60. That landscaping has been <br />established without a permanent irrigation system. <br />JANUUAII 13;1998 <br />-46- <br />• 0 <br />
The URL can be used to link to this page
Your browser does not support the video tag.