Laserfiche WebLink
too <br />J �p <br />Commissioner Adams noted there is a sidewalk from the school to 512 that was built <br />by the Exchange Club of Fellsmere through volunteer labor. The additional sidewalk is <br />sorely needed for the safety of the children. <br />Community Development Director Bob Keating advised this project is on DOT's <br />program for the year 1999-2000. The County could advance the funding for the project and <br />enter into a joint participation agreement with DOT. <br />Public Works Director Jim Davis believed it would not be possible to accomplish the <br />project by September due to a manpower shortage in the department. Also the DOT process <br />takes probably 3 to 4 months. The project would probably take 1 year to complete. <br />ON MOTION by Commissioner Eggert, <br />SECONDED by Commissioner Adams, the Board <br />unanimously directed staffto "fast track" the project. <br />9.B.2. PUBLIC DISCUSSION - PROPOSED SOFTBALL FIELD <br />ON FILBERT STREET IN SEBASTIAN - MS. LESLIE J. <br />RICHIE <br />The Board reviewed a letter of April 6, 1998 and Resolution R-98-17 of the City of <br />Sebastian: <br />AP�4R�-06-98 11:54 AM R I CS <br />tQ.1�-� WU-c A <br />/ 5 3 L c,Luq-� St <br />zap .-411 zagsz <br />51 - 5g1-44 56 <br />-�o Ge <br />561 589 6450 P.02 <br />0 1 <br />)0-�) 4 J / 97F <br />(J-0 I u o," 6 -LA <br />JJ <br />/L A h.Gcn A mol . wz wood ci -L t <br />P,,, -'Ad o-, iqtd, Caw4 <br />-rota <br />APRIL 14, 1998 <br />�)00 �1 <br />d� <br />,1-k , o,oc�.cvl ,rJo��6G.Q0 �Uzcl M <br />-70- <br />