My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4/21/1998
CBCC
>
Meetings
>
1990's
>
1998
>
4/21/1998
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 12:10:56 PM
Creation date
6/17/2015 10:54:52 AM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
04/21/1998
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
89
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
13. Concurrency: The development proposal will not affect any concurrency related services <br />(traffic, water, sewer, parks). Therefore, no concurrency certificate is required. <br />14. Environmental Issues: Since the project is under 5 acres, the native upland set-aside criteria <br />in section 929.05 do not apply. Also, it has been verified that there are no wetlands on the <br />site. Therefore, there are no LDR related environmental issues to address. <br />15. General Compatibility: The county land development regulations were drafted with the <br />intent that electrical substations are appropriate in residential areas under certain conditions. <br />Generally, uses such as wastewater treatment plants, electrical substations, schools, and <br />churches must be located near the area that they serve, and this is often a residential area. <br />Often, it is better to locate these uses on the periphery of neighborhoods instead of internal. <br />When these uses are controlled as to scope, scale, location, and buffering, the uses may be <br />appropriate on certain residentially zoned property. For that reason, these uses are allowed <br />in residential areas subject to special exception use approval. In staffs opinion, the city has <br />taken the necessary steps to ensure that this project is compatible with the surrounding area <br />and consistent with the LDRs and comprehensive plan. <br />16. Special Land Use Criteria: The following specific land use criteria apply to limited utility <br />uses: <br />See Chapter 901 for definition of utilities, public and private -limited; <br />Note: Substation is consistent with definition. <br />b. Between all above -ground facilities (except distribution and collection facilities) and <br />adjacent property having a residential land use designation, a Type "B" buffer (reduce <br />to Type "C" where abutting a local roadway, reduce to Type "D" buffer where <br />abutting a thoroughfare plan roadway) (with six-foot opaque screening) as specified <br />in Chapter 926, Landscaping, shall be provided; <br />Note: Landscape plan exceeds the Type "B" buffer with 6' opaque feature <br />requirement on the south and west sides of the project; and exceeds the Type <br />"C" buffer with 6' opaque feature on the north and east sides of the project. <br />C. All below -ground high voltage cables within a utility right-of-way shall be made <br />known to the public through the use of signs posted therein; <br />:Note: Appropriate signs will be posted. <br />d. In all zoning districts except the industrial districts, all equipment, machinery and <br />facilities which cannot by their size or nature be located within an enclosed building <br />shall be separated from adjacent properties having a residential land use designation <br />by a Type "D" buffer (with six-foot opaque screening) as specified in Chapter 926, <br />Landscaping; <br />Note: All equipment will either be in a building or screened by a buffer that <br />exceeds a Type "D" buffer. <br />e. Driveways located in close proximity to adjacent properties having a residential land <br />use designation shall provide a six-foot opaque screening between the driveway and <br />adjacent property. An eight -foot opaque screen may be required if deemed necessary <br />to mitigate noise and visual impacts. <br />Note: The existing driveway along the south property line will be screened by <br />the church with its new construction. Therefore, no driveway buffering is <br />required or proposed with this plan, only buffering of the building and facilities. <br />17. SR 60 Corridor Criteria: The proposed development is subject to the SR 60 corridor plan. <br />The major items of the SR 60 corridor plan are addressed below: <br />Landscaping. The SR 60 corridor plan requires roadway and foundation <br />landscaping, as well as screening of any visually offensive elements (e.g. electrical <br />substation equipment) from adjacent properties and rights-of-way. The proposed <br />landscape plan provides significant landscaping (existing and proposed vegetation) <br />and includes a berm and sufficient landscape material to achieve the screening of <br />proposed buildings and equipment <br />APRIL 21, 1998 <br />ri C1 <br />� iclt <br />-27- l P,��jf: 9"U <br />
The URL can be used to link to this page
Your browser does not support the video tag.