My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5/5/1998
CBCC
>
Meetings
>
1990's
>
1998
>
5/5/1998
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 12:10:57 PM
Creation date
6/17/2015 10:58:27 AM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
05/05/1998
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
76
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C <br />• <br />Engineering design has been completed by the staff of the Department of Utilitv <br />Services for Phase II -A. We are now ready to begin the assessment process associated <br />«•ith this project, as outlined. The assessment roll for Phase 11-A is attached. This <br />project is to be paid through the assessment of property owners along the proposed <br />water line route. Financing will be from the assessment fund, with inter -fund <br />borrowing from the water impact fee fund (472) and operations and maintenance fund <br />(471). <br />The estimated project cost and amount to be assessed for Phase H -A is $981,641.46. <br />The estimated cost per square foot is $0.191713 (rounded). <br />The estimated cost of Phase II is greater than Phase I, primarily due to a higher ratio of <br />improvements, concrete driveways, more stringent restoration specifications, and <br />conservancy with the estimate, as well as a smaller area of property to distribute the <br />cost over. The assessed cost, as with any project, will be regulated by the degree of <br />competition at the bidding of the project. <br />On April 22, 1998, a letter was sent to the City Manager, Thomas Frame, Citi• of <br />Sebastian with a copy of this agenda item and a map of the Phase II -A (Phase II) project <br />area. <br />RECOMMENDATION <br />The staff of the Department of Utility Services recommends that the Board of Countv <br />Commissioners approve the attached Resolutions I and 11 and set the public hearing <br />date. <br />MAY 59 1998 <br />ON MOTION by Commissioner Eggert, <br />SECONDED by Commissioner Ginn, the Board <br />unanimously adopted Resolution 98-055 providing <br />for the Sebastian Area Phase H -A Water Expansion <br />(an area located West of Roseland Road and North <br />of CR#512); providing the total estimated cost, <br />method of payment of assessments, number of <br />annual installments, and legal description of the area <br />specifically served. <br />�/ I � p i``' ti e; � Pp <br />Parcel <br />Proiect Nc. <br />Lots <br />I.D. Nos. Location <br />I1 -A UW -96 -20 -DS <br />479 <br />449 <br />West of Roseland Road in Lhe SE corner <br />i1 -E UW -97 -11 -DS <br />758 <br />714 <br />East of Roseland Road to Vocelle Avenue <br />,,-C LV -97 -12 -DS <br />562 <br />515 <br />North from Vocelle Avenue along Layport <br />Drive <br />II -D UW -97 -13 -DS <br />636 <br />608 <br />North from Layport Drive west from Fleming <br />Street <br />ii -E UW -97 -14 -DS <br />1,025 <br />912 <br />East of Fleming Street; including Main Street <br />to Louisiana Avenue <br />Total Lots <br />3.461 <br />3,208 <br />Parcel I.D. Nos. <br />Engineering design has been completed by the staff of the Department of Utilitv <br />Services for Phase II -A. We are now ready to begin the assessment process associated <br />«•ith this project, as outlined. The assessment roll for Phase 11-A is attached. This <br />project is to be paid through the assessment of property owners along the proposed <br />water line route. Financing will be from the assessment fund, with inter -fund <br />borrowing from the water impact fee fund (472) and operations and maintenance fund <br />(471). <br />The estimated project cost and amount to be assessed for Phase H -A is $981,641.46. <br />The estimated cost per square foot is $0.191713 (rounded). <br />The estimated cost of Phase II is greater than Phase I, primarily due to a higher ratio of <br />improvements, concrete driveways, more stringent restoration specifications, and <br />conservancy with the estimate, as well as a smaller area of property to distribute the <br />cost over. The assessed cost, as with any project, will be regulated by the degree of <br />competition at the bidding of the project. <br />On April 22, 1998, a letter was sent to the City Manager, Thomas Frame, Citi• of <br />Sebastian with a copy of this agenda item and a map of the Phase II -A (Phase II) project <br />area. <br />RECOMMENDATION <br />The staff of the Department of Utility Services recommends that the Board of Countv <br />Commissioners approve the attached Resolutions I and 11 and set the public hearing <br />date. <br />MAY 59 1998 <br />ON MOTION by Commissioner Eggert, <br />SECONDED by Commissioner Ginn, the Board <br />unanimously adopted Resolution 98-055 providing <br />for the Sebastian Area Phase H -A Water Expansion <br />(an area located West of Roseland Road and North <br />of CR#512); providing the total estimated cost, <br />method of payment of assessments, number of <br />annual installments, and legal description of the area <br />specifically served. <br />�/ I � p i``' ti e; � Pp <br />
The URL can be used to link to this page
Your browser does not support the video tag.