My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5/19/1998
CBCC
>
Meetings
>
1990's
>
1998
>
5/19/1998
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 12:10:57 PM
Creation date
6/17/2015 11:01:47 AM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
05/19/1998
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
88
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
011; i PACE <br />ORDINANCE NO. 98- 0 9 <br />(6) Landscaping <br />The countywide landscaping requirements of LDR Chap--er 926 shall apply except as <br />noted herein. <br />W. Increased Canopy Tree Size <br />1 -17741 0 <br />W SR 60 and Thoroughfare Plan Road Buffer <br />Within the corridor elan area. the following Iandscape buffer shall be provided <br />along the entire length of a site's SR 60.43rd Avenue. 58th Avenue. 66th Avenue. <br />74th Avenue. 82nd Avenue. 90th Avenue. and 98th Avenue frontages. except for <br />approved driveways: <br />Minimum Planting/Berm <br />Buffer Depth RRe uirementsep r 100' <br />4 canopy trees <br />5 understory trees <br />20' or more Continuous hedge': 1 W-2%'. <br />high atIn anting <br />Berm: 1Y2-'- 3' high' <br />4.5 canopy trees <br />5.5 understory trees <br />IL Continuous hedge': 1'/Z -3' <br />high at planting <br />Benn: l'-2Y2'high' <br />5 canopy Uves <br />6 understory trees <br />10, Continuous hedge': 2Y2'-3' <br />Project sites with a depth from SR 60 or a Thoroughfare Plan road of 250'-400' <br />shall have a buffer dem of at least 15'. Sites with a dgth over 400' shall have a <br />buffer depth of at least 20'. <br />(See Figures F-4 and F-5 at end of section 911.18. "Wabasso Corridor <br />Re ations") <br />1NOTE: The hedge and berm combination shall provide a visual screen 4' high <br />above the grade of the project site parking_area Hedge material shall provide full <br />scn=in to the ground: thereforewax myrtles and shrubs with similar leafing <br />characteristics shall not be used for hedge material unless a double row <br />arrangement is used At the time of a certificate of occupana (CO) for therpoiect <br />site, the combination of berming�and hedging shall provide a 4' visual screen. <br />subiect to comfy sight distance requirements Undulations in the berm and <br />corresponding hedge height are encouraged <br />Hedge shrubs shall be planted no further apart than 24" on center alonghe eng lei <br />of the buffer strip to form a hedge that appears continuous as viewed from the <br />roadway being buffered. Berms shall have a slope no steeper than 3 horizontal to 1 <br />vertical and shall be continuous along he le gth of the buffer strip. -Q&q= where <br />berth modifications may be necessary for tree preservation as determined by the <br />commutity development director or his designee, <br />MAY 199 1998 <br />-39- <br />0 <br />
The URL can be used to link to this page
Your browser does not support the video tag.