Laserfiche WebLink
BOOK 10 6 PAGE <br />Note: Through the PD process, the applicant is requesting a waiver to the 40% building <br />coverage criterion in exchange for providing more than the required 25% open space and <br />increased setbacks. <br />6. Impervious Area: Proposed: 140,804 sq. ft. <br />7. Open Space: Required in CG: 25% <br />Proposed in PD: 30% <br />Note: The minimum open space required through the PD rezoning process will be 30%. <br />8. Parking: Required: 9 spaces <br />Provided: 9 spaces <br />Note: Parking is provided based upon new county parking standards for mini storage uses. <br />9. Setbacks: Front: Required by PD: 90' <br />Provided: 100' <br />Rear: Required by PD: 200' <br />Provided: 210' <br />Sides: Required by PD: 11' <br />Provided: 11' <br />Note: These setback requirements are proposed to be established for the subject site through <br />the proposed PD district rezoning. <br />10. Traffic Circulation: The project will have a single right-inhight-out driveway to SR 60. <br />The driveway will provide access to parking areas and mini storage units for loading and <br />unloading. The driving aisle along the front of the office and residence will be stubbed out <br />to the east and west property lines to provide for future interconnections with adjacent <br />commercial uses. The internal circulation plan, which includes a 28' two-way driving aisle <br />to serve most of the storage units, has been reviewed and approved by the traffic engineering <br />division. Based on the low trip rate, no off site traffic improvements are required, and none <br />are proposed. <br />11. Stormwater Management: The project's stormwater management plan has been approved <br />by the public works department, and the developer will be required to obtain a Type "A" <br />permit prior to site plan release. There is a single stormwater pond proposed at the south end <br />of the site which provides additional setbacks and buffering for the residential uses to the <br />south. Since the pond is over 2' deep, the stormwater management ordinance requires the <br />pond to be fenced or otherwise secured by a barrier. The applicant has proposed use of a <br />vinyl clad chain link fence, in accordance with the SR 60 corridor plan. <br />12. Utilities: The project will be connected to county water and sewer. This meets both <br />concurrency requirements and utility connection matrix requirements. These utility <br />provisions have been approved by the county's Department of Utility Services and the State <br />Health Department. <br />13. Landscape Plan and Buffers: The landscape plan generally complies with Chapter 926 and <br />the SR 60 corridor plan. This plan depicts a Type "B" buffer with a 6' opaque feature along <br />the south property line adjacent to the mobile home park. The applicant proposes to use <br />vegetation rather than a masonry wall to satisfy the 6' opaque feature requirement. In order <br />to achieve this buffer, the applicant is proposing to use over 5 times the understory trees <br />June 9, 1998 <br />