My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7/7/1998
CBCC
>
Meetings
>
1990's
>
1998
>
7/7/1998
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 12:10:57 PM
Creation date
6/17/2015 11:07:40 AM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
07/07/1998
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
63
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TO: James E. Chandler <br />County Administrator <br />DIVUSION HEAD CONCURRENCE: <br />ohert M. Keating, AIC <br />Community Development Dire r <br />THROUGH: Stan Boling,14 <br />Planning Director <br />FROM: John W. McCoy, AICP <br />Senior Planner, Current Development <br />DATE: June 30, 1998 <br />SUBJECT: Laurel Homes Inc.'s Request for Final Plat Approval for a Single Family Subdivision <br />to be Known as Phases 3 & 4 of The Laurels Subdivision <br />It is requested that the data herein presented be given formal consideration by the Board of County <br />Commissioners at its regular meeting of July 7, 1998. <br />The Laurels Phases 3 & 4 is a subdivision of a 19.11 acre parcel into 56 single family lots and <br />stormwater tracts. The overall subdivision (Phases 1-4) will consist of 112 single family lots on a <br />total of 39.67 acres, resulting in an overall density of 2.84 units per acre. The subject property is <br />zoned RS -6, Residential Single Family (up to 6 units/acre). <br />On August 27, 1992, the Planning and Zoning Commission granted preliminary plat approval for <br />The Laurels subdivision to be completed in four phases. The first two phases are complete. <br />Subsequently, a land development permit was issued for construction of Phases 3 and 4. Since the <br />required improvements (e.g. roadways, stormwater management, utilities) for Phases 3 & 4 have <br />not been completed at this time, the developer is proposing to "bond -out" to guarantee the <br />satisfactory completion of the remaining work to be performed. The final plat was submitted with <br />the following documents: <br />A final plat that is substantially in conformance with the originally approved preliminary <br />plat; <br />2. A copy of the Contract for Construction of Required Subdivision Improvements; <br />ANALYSIS: <br />The final plat substantially conforms to the approved preliminary plat, but is not consistent with the <br />approved arrangement for the dedication of 10'" Street right-of-way. The approved preliminary plat <br />required a dedication of 25' of right-of-way for l Ot' Street (an existing unpaved road located in a 35' <br />wide "half street" right-of-way) with the condition that the developer escrow her fairshare for future <br />paving. Based on an opinion from the attorney's office, a decision has been made by staff to proceed <br />with final plat approval without a revised preliminary plat or compliance with the dedication <br />condition. Essentially, the attorney's office has determined that the right-of-way dedication cannot <br />be required since the subdivision streets are no longer connecting to 10* Street, as originally <br />proposed, and the subdivision will not be contributing trips to the street. The end result is that for <br />now, 10' Street will remain as it is. Only a stabilized, sodded emergency accessway will connect <br />the proposed subdivision to 10'h Street. <br />Not all of the required subdivision improvements have been completed as of this date. The <br />developer desires to proceed with recording the subdivision plat and proposes to "bond -out" for <br />construction of the remaining required subdivision improvements pursuant to provisions of <br />subdivision ordinance section 913.10. TIC developer has made arrangements with Public Works <br />and Utility Services to submit a final certified engineers cost estimate and letter of credit after the <br />Board of County Commissioners grants final plat approval. The final cost estimate will be based <br />on the work completed at that point in time as verified by county staff. The format of the letter of <br />credit has been approved by the county attorney's office, and unit costs for construction items have <br />been approved by Public Works and Utility Services. The developer has also submitted a copy of <br />JULY 7, 1998 <br />-10- <br />`0 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.